Parallel Intelligent Decision Supporting System of Underground Powerhouse Construction of Large Hydroelectric Power Station

被引:0
|
作者
Jiang Annan [1 ]
Su Guoshao [2 ]
Ru Zhongliang [2 ]
机构
[1] Maritime Univ, Coll Traff & Logist Engn, Dalian, Peoples R China
[2] Guangxi Univ, Sch Civil & Architecture Engn, Nanning, Peoples R China
关键词
underground powerhouse; intelligence decision supporting system; feedback analysis; parallel computing;
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Large hydraulic underground powerhouse in construction is a complex dynamic process, the decision of construction could neither depend on mechanical computing nor experience exclusively. It has significant sense to construct automatic, integrative and expeditious decision supporting system. The paper constructs a basic frame combing data base, knowledge base, model base and referring machine based on parallel computing technique. Based on the frame, an intelligence decision supporting system combing mechanical calculation and experience analysis methods has been developed. The object-oriented programming is carried out and the visual software is developed. It is shown feasible from its application in Shuibuya underground powerhouse of China.
引用
收藏
页数:4
相关论文
共 50 条
  • [1] Construction and monitoring study of large underground powerhouse caverns of Xiangjiaba Hydropower Station
    Fan, Qixiang
    Liu, Yiyong
    Wang, Yi
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2011, 30 (04): : 666 - 676
  • [2] Geodetic Monitoring of Large-Span Underground Facilities During Construction of the Rogun Hydroelectric Power Station
    Nazirov J.A.
    Davlatshoev S.K.
    Kozlov D.V.
    Power Technology and Engineering, 2018, 52 (4) : 400 - 404
  • [3] The vibration response of large underground powerhouse under the action of endogenous power station
    Wang, Jian
    Zhang, Lixiang
    Guo, Tao
    MANUFACTURING PROCESS AND EQUIPMENT, PTS 1-4, 2013, 694-697 : 436 - 438
  • [4] Research on Vibration Characteristics of an Underground Powerhouse of Large Pumped-Storage Power Station
    Zhang, Lijuan
    Guo, Yaohua
    Wang, Haijun
    Yang, Xuliang
    Lian, Jijian
    ENERGIES, 2022, 15 (24)
  • [5] Cause analysis of cracks of shotcrete layer around the downstream hance in underground powerhouse of Jinping I hydroelectric power station
    Liu, Jianyou
    Wu, Faquan
    Zhao, Zhenhua
    Li, Shengqing
    Qi, Shengwen
    Liu, Tong
    Dong, Jinyu
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2010, 29 (SUPPL. 2): : 3777 - 3784
  • [6] Investigation on effect evaluation of seepage control system of large underground powerhouse of the Baihetan hydropower station
    Qiu, Qinyan
    Rong, Guan
    Zhang, Huqi
    Chen, Wenfu
    Tan, Yaosheng
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2023, 142
  • [7] Stabilization of a large rock wedge in the underground powerhouse of the Pergau Hydroelectric Project, Malaysia.
    Varley, PM
    Parkin, RJH
    Patel, R
    GROUND ANCHORAGES AND ANCHORED STRUCTURES, 1997, : 158 - 171
  • [8] Stability study of a pumped storage power station's underground powerhouse
    Huang, Hui
    Ren, Guang Ming
    ADVANCES IN CIVIL AND INDUSTRIAL ENGINEERING, PTS 1-4, 2013, 353-356 : 1635 - 1638
  • [9] Construction of a large underground station under a station in operation
    Niibori, T.
    Seki, Y.
    Sato, T.
    Yamada, T.
    Fujiwara, T.
    UNDERGROUND SPACE - THE 4TH DIMENSION OF METROPOLISES, VOLS 1-3, 2007, : 143 - +
  • [10] Intelligent identification of underground powerhouse of pumped-storage power plant
    Wanquan Sun
    Zhenyue Ma
    Xudong Yan
    Junxiu Qi
    Xiaojing Du
    Acta Mechanica Sinica, 2005, 21 : 187 - 191