共 50 条
- [1] OPERATING EXPERIENCE WITH THE AUTOMATION OF A PRECALCINER KILN AT THE MANNERSDORF CEMENT PLANT, AUSTRIA [J]. ZEMENT-KALK-GIPS, 1991, 44 (06): : 281 - 285
- [2] EXPERIENCE GAINED IN DESIGNING, BUILDING AND OPERATING A 4700 T-DAY PRODUCTION PLANT WITH PRECALCINER AT THE SLITE CEMENT WORKS IN SWEDEN [J]. ZEMENT-KALK-GIPS, 1981, 34 (02): : 63 - 71
- [3] EXPERIENCE GAINED IN DESIGNING, BUILDING AND OPERATING A 4700 T-DAY PRODUCTION PLANT WITH PRECALCINER AT THE SLITE-CEMENT-WORKS IN SWEDEN [J]. ZEMENT-KALK-GIPS, 1980, 33 (12): : 601 - 609
- [4] The precalciner plant at the Bernburg cement works -: requirement profile and flexibility [J]. ZKG INTERNATIONAL, 1999, 52 (04): : 172 - +
- [5] OPERATING EXPERIENCE WITH THE COAL GRINDING PLANT AT THE MERGELSTETTEN CEMENT WORKS [J]. ZEMENT-KALK-GIPS, 1982, 35 (08): : 391 - 397
- [6] Initial operating experience with a combined grinding plant in the Geseke cement works [J]. ZKG INTERNATIONAL, 1995, 48 (09): : 480 - 484
- [7] Tradition and progress - A report on the Rudersdorf cement works [J]. ZKG INTERNATIONAL, 2004, 57 (01): : 18 - 23
- [8] Environmental compatibility and plant safety when using secondary materials at the Rudersdorf cement works [J]. ZKG INTERNATIONAL, 1999, 52 (11): : 596 - +
- [9] Identification and Control of Precalciner in the Cement Plant [J]. CONTROLO 2020, 2021, 695 : 126 - 135
- [10] Operating results from the first 30 months with the new kiln line 5 at the Rudersdorf cement works [J]. ZKG INTERNATIONAL, 1998, 51 (08): : 410 - +