Scheduling of displacement batch digesters using discrete time formulation

被引:5
|
作者
Shaik, Munawar A. [1 ]
Bhat, Shrikant [2 ]
机构
[1] Indian Inst Technol Delhi, Dept Chem Engn, New Delhi 110016, India
[2] ABB Global Ind & Serv Ltd, Corp Res Ctr, Bangalore 560048, Karnataka, India
来源
关键词
Optimization; Scheduling; Discrete-time representation; State-task-network representation; Displacement batch digesters; Pulp industry; GENERAL ALGORITHM; OPERATIONS; PLANTS;
D O I
10.1016/j.cherd.2013.07.026
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
This paper provides mathematical programming based optimization model and computational results for short-term scheduling of displacement batch digesters in a pulp industry. The scheduling problem involves development of an optimal solution that yields the best sequence of operations in each of the parallel batch digesters sharing common resources. The constraints are imposed on meeting the demand of pulp of different qualities within a specified time horizon. The problem comprises of both fixed-time and variable time durations of the tasks, different storage policies, zero-wait and finite wait times, and handling of shared resources. The scheduling problem is formulated using a state-task-network (STN) representation of production recipes, based on discrete time representation resulting in a mixed-integer linear programming (MILP) problem which is solved using GAMS software. The basic framework is adapted from the discrete-time model of Kondili et al. (Comput. Chem. Eng., 1993, 17, 211-227). Different case studies involving parallel digesters in multiple production lines are considered to demonstrate the effectiveness of the proposed formulation using two different objective functions. (C) 2013 The Institution of Chemical Engineers. Published by Elsevier B.V. All rights reserved.
引用
收藏
页码:318 / 339
页数:22
相关论文
共 50 条
  • [1] Rapid displacement heating In batch digesters
    Swift, L.K.
    Dayton, J.S.
    Pulp and Paper Canada, 1988, 89 (08): : 70 - 76
  • [2] RAPID DISPLACEMENT HEATING IN BATCH DIGESTERS
    SWIFT, LK
    DAYTON, JS
    PULP & PAPER-CANADA, 1988, 89 (08) : 70 - 76
  • [3] A novel nonuniform discrete time formulation for short-term scheduling of batch and continuous processes
    Lee, KH
    Park, HI
    Lee, IB
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2001, 40 (22) : 4902 - 4911
  • [4] Improving the efficiency of discrete time scheduling formulation
    Yee, KL
    Shah, N
    COMPUTERS & CHEMICAL ENGINEERING, 1998, 22 : S403 - S410
  • [5] Enhanced Discrete Time Formulation for a Short-Term Batch Process Scheduling Problem with Utility Constraints
    Wang, Yue
    Jin, Xin
    Lu, Shan
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2019, 58 (31) : 14559 - 14568
  • [6] Continuous-time scheduling formulation for multipurpose batch plants
    Mostafaei, Hossein
    Harjunkoski, Iiro
    AICHE JOURNAL, 2020, 66 (02)
  • [7] Extended Discrete-Time Resource Task Network Formulation for the Reactive Scheduling of a Mixed Batch/Continuous Process
    Nie, Yisu
    Biegler, Lorenz T.
    Wassick, John M.
    Villa, Carlos M.
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2014, 53 (44) : 17112 - 17123
  • [8] Discrete Time Formulation for the Integration of Scheduling and Dynamic Optimization
    Nie, Yisu
    Biegler, Lorenz T.
    Villa, Carlos M.
    Wassick, John M.
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2015, 54 (16) : 4303 - 4315
  • [9] A discrete time formulation for batch processes with storage capacity and storage time limitations
    Kilic, Onur A.
    van Donk, Dirk Pieter
    Wijngaard, Jacob
    COMPUTERS & CHEMICAL ENGINEERING, 2011, 35 (04) : 622 - 629
  • [10] Single Reference Grid Continuous-Time Formulation for Batch Scheduling
    Mostafaei, Hossein
    Harjunkoski, Iiro
    IFAC PAPERSONLINE, 2019, 52 (01): : 832 - 837