Multi-objective optimization of maintenance program in multi-unit nuclear power plant sites

被引:12
|
作者
Zhang, Sai [1 ,3 ]
Du, Mengyu [2 ]
Tong, Jiejuan [1 ]
Li, Yan-Fu [2 ]
机构
[1] Tsinghua Univ, Collaborat Innovat Ctr Adv & Safety Nucl Energy T, Inst Nucl & New Energy Technol, Key Lab Adv Reactor Engn & Safety,Minist Educ, Beijing 100084, Peoples R China
[2] Tsinghua Univ, Dept Ind Engn, Beijing 100084, Peoples R China
[3] Univ Illinois, Urbana, IL 61801 USA
基金
中国国家自然科学基金;
关键词
Multi-Unit Probabilistic Risk Assessment (MUPRA); Multi-Objective Optimization (MOO); Fast Non-dominated Sorting Generic Algorithm (NSGA-II); Maintenance optimization; Nuclear Power Plant (NPP); High-Temperature Gas-cooled Reactor (HTGR); PROBABILISTIC SAFETY ASSESSMENT; GENETIC ALGORITHM APPROACH; SURVEILLANCE TEST INTERVAL; TECHNICAL SPECIFICATIONS; RISK; SYSTEMS; REQUIREMENTS; UNCERTAINTY;
D O I
10.1016/j.ress.2019.03.034
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Maintenance program optimization of nuclear power plants (NPPs) has been a research focus over the past decades, and the existing works are mostly conducted with a one-reactor-at-a-time presumption. Multi-unit NPP site design (i.e., a single site houses multiple reactors), however, is a common case, in which the reactors are not independent from each other, rather, connected by complex intra- and inter-unit mechanisms. To bridge the research gap and generate practically useful results, a methodology of conducting multi-objective optimization for maintenance program in the context of multi-unit NPP sites is proposed in this research. The maintenance optimization is formulated as a tri-objective scheme aiming at minimizing multi-unit unavailability, site-wide risk and cost. Case studies are conducted on feedwater systems adapted from a real-world two-unit NPP site with and without uncertainties. It can be concluded that, for the case studies in this paper, (i) risk attitudes, in the form of weighting factors of risk types with radiological consequences of different severities, of NPP decision makers and regulators could notably affect the optimal maintenance scheduling and the projected objective values; (ii) the optimization model under uncertainties can be taken as a generalization of that without uncertainties and could have the chance of discovering new Pareto-optimal solutions leading to lower costs without compromising multi-unit unavailability or risk.
引用
收藏
页码:532 / 548
页数:17
相关论文
共 50 条
  • [1] Multi-Objective Optimization in Multi-Attribute and Multi-Unit Combinatorial Reverse Auctions
    Shil, Shubhashis Kumar
    Sadaoui, Samira
    [J]. INTERNATIONAL JOURNAL ON ARTIFICIAL INTELLIGENCE TOOLS, 2017, 26 (05)
  • [2] Probabilistic safety assessment of multi-unit nuclear power plant sites - An integrated approach
    Reactor Design Group, IGCAR, Kalpakkam, Tamil Nadu 603 102, India
    不详
    [J]. J. Loss Prev. Process Ind., 1 (52-62):
  • [3] Probabilistic safety assessment of multi-unit nuclear power plant sites - An integrated approach
    Hassija, Varun
    Kumar, C. Senthil
    Velusamy, K.
    [J]. JOURNAL OF LOSS PREVENTION IN THE PROCESS INDUSTRIES, 2014, 32 : 52 - 62
  • [4] MULTI-OBJECTIVE OPTIMIZATION OF ELECTRIC HEATING PRESSURIZER IN NUCLEAR POWER PLANT
    Wang, Cheng
    Yan, Chang-Qi
    Wang Jian-Jun
    Li, Fei-Fei
    [J]. PROCEEDINGS OF THE 24TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING, 2016, VOL 5, 2016,
  • [5] A MULTI-OBJECTIVE OPTIMIZATION OF THE REACTOR POWER PLANT
    Chen Lei
    Jia Zhen
    Wang Cong
    Gong Zili
    Liao Yi
    Hu Chen
    [J]. PROCEEDINGS OF THE 26TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING, 2018, VOL 1, 2018,
  • [6] Integrated multi-objective predictive control for multi-unit system
    Ravi, Arvind
    Kaisare, Niket
    [J]. 2019 SIXTH INDIAN CONTROL CONFERENCE (ICC), 2019, : 212 - 217
  • [7] Multi-objective System Reliability Optimization in a Power Plant
    Chebouba, Billal Nazim
    Mellal, Mohamed Arezki
    Adjerid, Smail
    [J]. PROCEEDINGS 2018 3RD INTERNATIONAL CONFERENCE ON ELECTRICAL SCIENCES AND TECHNOLOGIES IN MAGHREB (CISTEM), 2018, : 978 - 981
  • [8] MULTI-OBJECTIVE OPTIMIZATION OF POWER PLANT MAINTENANCE PROJECTS BASED ON NSGA-II
    Gu Yu-Jiong
    Ren Zhi-Zheng
    Chen Kun-Liang
    Chen Dong-Chao
    [J]. 2011 3RD INTERNATIONAL CONFERENCE ON COMPUTER TECHNOLOGY AND DEVELOPMENT (ICCTD 2011), VOL 3, 2012, : 791 - 798
  • [9] Advances in multi-unit nuclear power plant probabilistic risk assessment
    Modarres, Mohammad
    Zhou, Taotao
    Massoud, Mahmoud
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 2017, 157 : 87 - 100
  • [10] A Resources Provision Policy for Multi-unit Maintenance Program
    Cahyo, Winda Nur
    El-Akruti, Khaled
    Dwight, Richard
    Zhang, Tieling
    [J]. ENGINEERING ASSET MANAGEMENT - SYSTEMS, PROFESSIONAL PRACTICES AND CERTIFICATION, 2015, : 241 - 252