Estimating the cost of improving service quality in water supply: A shadow price approach for England and wales

被引:23
|
作者
Molinos-Senante, Maria [1 ,2 ,3 ,4 ]
Maziotis, Alexandros [5 ]
Sala-Garrido, Ramon [6 ]
机构
[1] Pontificia Univ Catolica Chile, Dept Ingn Hidraul & Ambiental, Santiago, Chile
[2] Pontificia Univ Catolica Chile, Escuela Arquitectura, Santiago, Chile
[3] Pontificia Univ Catolica Chile, Inst Estudios Urbanos, Santiago, Chile
[4] Ctr Desarrollo Urbano Sustentable CONICYT FONDAP, Santiago, Chile
[5] Fdn Eni Enrico Mattei, I-30124 Venice, Italy
[6] Univ Valencia, Dept Math Econ, Valencia 46022, Spain
关键词
UNDESIRABLE OUTPUTS; EMPIRICAL-ANALYSIS; TECHNICAL CHANGE; PRODUCTIVITY; EFFICIENCY; INDUSTRY; PERFORMANCE; SCALE; TECHNOLOGY; ECONOMIES;
D O I
10.1016/j.scitotenv.2015.08.155
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Service quality to customers is an aspect that cannot be ignored in the performance assessment of water companies. Nowadays water regulators introduce awards or penalties to incentivize companies to improve service quality to customers when setting prices. In this study, the directional distance function is employed to estimate the shadow prices of variables indicating the lack of service quality to customers in the water industry i.e., written complaints, unplanned interruptions and properties below the reference level. To calculate the shadow price of each undesirable output for each water company, it is needed to ascribe a reference price for the desirable output which is the volume of water delivered. An empirical application is carried out for water companies in England and Wales. Hence, the shadow price of each undesirable output is expressed both as a percentage of the price of the desirable output and in pence per cubic meter of water delivered The estimated results indicate that on average, each additional written complaint that needs to be dealt with by the water company includes a service quality cost of 0.399p/m(3). As expected, when looking at the other service quality variables which involve network repair or replacement, these values are considerably higher. On average, the water company must spend an extra 0.622p/m(3) to prevent one unplanned interruption and 0.702p/m(3) to avoid one water pressure below the reference level. The findings of this study are of great importance for regulated companies and regulators as it has been illustrated that improvements in the service quality in terms of customer service could be challenging and therefore ongoing investments will be required to address these issues. (C) 2015 Elsevier B.V. All rights reserved.
引用
收藏
页码:470 / 477
页数:8
相关论文
共 50 条
  • [1] The cost of reducing unplanned water supply interruptions: A parametric shadow price approach
    Maziotis, Alexandros
    Villegas, Andres
    Molinos-Senante, Maria
    [J]. SCIENCE OF THE TOTAL ENVIRONMENT, 2020, 719
  • [2] Improving Water Quality in England and Wales: Local Endowments and Willingness to Pay
    Solino, M.
    Joyce, J.
    Farizo, B. A.
    [J]. INTERNATIONAL JOURNAL OF ENVIRONMENTAL RESEARCH, 2013, 7 (03) : 723 - 732
  • [3] Assesing the Impact of Quality of Service on the Productivity of Water Industry: a Malmquist-Luenberger Approach for England and Wales
    Alexandros Maziotis
    María Molinos-Senante
    Ramon Sala-Garrido
    [J]. Water Resources Management, 2017, 31 : 2407 - 2427
  • [4] Assesing the Impact of Quality of Service on the Productivity of Water Industry: a Malmquist-Luenberger Approach for England and Wales
    Maziotis, Alexandros
    Molinos-Senante, Maria
    Sala-Garrido, Ramon
    [J]. WATER RESOURCES MANAGEMENT, 2017, 31 (08) : 2407 - 2427
  • [5] Developing upstream competition in the England and Wales water supply industry: A new approach
    Stern, Jon
    [J]. UTILITIES POLICY, 2012, 21 : 1 - 16
  • [6] AN APPROACH TO IMPROVING COST ESTIMATING
    STOCKTON, DJ
    MIDDLE, JE
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1982, 20 (06) : 741 - 751
  • [7] Estimating the environmental and resource costs of leakage in water distribution systems: A shadow price approach
    Molinos-Senante, Maria
    Mocholi-Arce, Manuel
    Sala-Garrido, Ramon
    [J]. SCIENCE OF THE TOTAL ENVIRONMENT, 2016, 568 : 180 - 188
  • [8] WATER SUPPLY INDUSTRY VIEWPOINT ON REORGANIZATION IN ENGLAND AND WALES
    不详
    [J]. WATER AND WATER ENGINEERING, 1972, 76 (917): : 248 - &
  • [9] Accounting for service quality to customers in the efficiency of water companies: evidence from England and Wales
    Molinos-Senante, Maria
    Maziotis, Alexandros
    Mocholi-Arce, Manuel
    Sala-Garrido, Ramon
    [J]. WATER POLICY, 2016, 18 (02) : 513 - 532
  • [10] Improving cost recovery in urban water supply service: an experience from India
    Jayaramu, K. P.
    Kumar, B. Manoj
    Rashmi, K. K. Prasanna
    [J]. WATER POLICY, 2016, 18 (03) : 685 - 707