Impact of hydraulic retention time on organic and nutrient removal in a membrane coupled sequencing batch reactor

被引:60
|
作者
Xu, Shengnan [1 ]
Wu, Donglei [2 ]
Hu, Zhiqiang [1 ]
机构
[1] Univ Missouri, Dept Civil & Environm Engn, Columbia, MO 65211 USA
[2] Zhejiang Univ, Dept Environm Engn, Hangzhou, Zhejiang, Peoples R China
关键词
Hydraulic retention time; Biological nutrient removal; Sequencing batch reactor; Membrane bioreactor; Phosphorus release and uptake; MUNICIPAL WASTE-WATER; BIOLOGICAL PHOSPHORUS REMOVAL; NITROGEN REMOVAL; OPERATIONAL CONDITION; PHOSPHATE-UPTAKE; PERFORMANCE; SLUDGE; BIOREACTOR; BACTERIA; MBR;
D O I
10.1016/j.watres.2014.01.046
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Although solids retention time (SRT) is the key parameter in wastewater treatment design and operation, this study determined the effect of hydraulic retention time (HRT) on biological nutrient removal in a membrane coupled sequencing batch reactor (MSBR) at the fixed SRT of 10 days. During more than 200 days of operation, the HRT of the MSBR were decreased from 24 to 12 and to 6 h while the volumetric exchange ratio in each operating cycle was fixed at 50%. The decrease of HRT led to a proportional increase in biomass concentration at the fixed SRT. The system demonstrated excellent removal of organic matter with the highest COD removal efficiency (97%) achieved at the shortest HRT of 6 h. As HRT was reduced from 24 to 12 h, the total nitrogen removal efficiency improved from 68 +/- 5% to 80 +/- 4%, but there was no further improvement when HRT decreased to 6 h. Coincidently, similar and higher abundance of nitrifying bacteria was observed in the MSBR operated at the HRTs of 6 and 12h than that at the HRT of 24 h. The total phosphorus removal efficiencies were 62 +/- 15%, 77 +/- 4% and 85 +/- 3% at the HRTs of 24,12 and 6 h, respectively. The maximum P release rates for activated sludge at the HRTs of 24, 12 and 6 h were 3.7 +/- 0.5, 6.4 +/- 0.2 and 8.7 +/- 0.1 mg P/h, respectively, while the maximum P uptake rates were 3.2 +/- 0.1, 8.6 +/- 0.2 and 15.2 +/- 0.2 mg P/h, respectively. Contradictory to the theory that effluent water quality is solely SRT dependent, the results suggest that it is also affected by HRT and resultant biomass concentration possibly due to factors such as change in hydrolysis of particulate organic matter, the unique microenvironment and transition between anaerobic and aerobic metabolism at high biomass concentrations in MSBR operation. (C) 2014 Elsevier Ltd. All rights reserved.
引用
收藏
页码:12 / 20
页数:9
相关论文
共 50 条
  • [1] Effect of sluge retention time on nutrient removal by a humus soil sequencing batch reactor
    Zhu, Rui
    Wu, Min
    Yang, Jian
    Wei, Chuanyin
    Zhang, Bin
    2009 INTERNATIONAL CONFERENCE ON ENERGY AND ENVIRONMENT TECHNOLOGY, VOL 3, PROCEEDINGS, 2009, : 290 - 293
  • [2] Impact of hydraulic retention time on swine wastewater treatment by aerobic granular sludge sequencing batch reactor
    Xiaochun Wang
    Ji Li
    Xiaolei Zhang
    Zhonglin Chen
    Jimin Shen
    Jing Kang
    Environmental Science and Pollution Research, 2021, 28 : 5927 - 5937
  • [3] Impact of hydraulic retention time on swine wastewater treatment by aerobic granular sludge sequencing batch reactor
    Wang, Xiaochun
    Li, Ji
    Zhang, Xiaolei
    Chen, Zhonglin
    Shen, Jimin
    Kang, Jing
    ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2021, 28 (05) : 5927 - 5937
  • [4] Methanosarcina domination in anaerobic sequencing batch reactor at short hydraulic retention time
    Ma, Jingwei
    Zhao, Baisuo
    Frear, Craig
    Zhao, Quanbao
    Yu, Liang
    Li, Xiujin
    Chen, Shulin
    BIORESOURCE TECHNOLOGY, 2013, 137 : 41 - 50
  • [5] Hydraulic residence time effects in biological nutrient removal using five-step sequencing batch reactor
    Kargi, F
    Uygur, A
    ENZYME AND MICROBIAL TECHNOLOGY, 2004, 35 (2-3) : 167 - 172
  • [6] Effect of influent nutrient ratios and hydraulic retention time (HRT) on simultaneous phosphorus and nitrogen removal in a two-sludge sequencing batch reactor process
    Wang, Yayi
    Peng, Yongzhen
    Stephenson, Tom
    BIORESOURCE TECHNOLOGY, 2009, 100 (14) : 3506 - 3512
  • [7] Biohydrogen production from organic solid waste in a sequencing batch reactor: An optimization of the hydraulic and solids retention time
    Santiago, Sonia G.
    Morgan-Sagastume, Juan M.
    Monroy, Oscar
    Moreno-Andrade, Ivan
    INTERNATIONAL JOURNAL OF HYDROGEN ENERGY, 2020, 45 (47) : 25681 - 25688
  • [8] Effect of sludge retention time (SRT) on nutrient removal in sequencing batch reactors
    Furumai, H
    Kazmi, AA
    Furuya, Y
    Sasaki, K
    JOURNAL OF ENVIRONMENTAL SCIENCE AND HEALTH PART A-TOXIC/HAZARDOUS SUBSTANCES & ENVIRONMENTAL ENGINEERING, 1999, 34 (02): : 317 - 328
  • [9] A membrane coupled to a sequencing batch reactor for water reuse and removal of coliform bacteria
    Arrojo, B
    Mosquera-Corra, A
    Garrido, JM
    Méndez, R
    Ficara, E
    Malpei, F
    DESALINATION, 2005, 179 (1-3) : 109 - 116
  • [10] Nutrient removal and sludge age in a sequencing batch reactor
    Bernal-Martinez, A.
    Gonzaiez-Barcelo, O.
    Gonzalez-Martinez, S.
    2000, Springer Verlag, Heidelberg, Germany (23)