Conversion of a complete denture to a provisional implant-supported, screw-retained fixed prosthesis for immediate loading of a completely edentulous arch

被引:21
|
作者
Kammeyer, G [1 ]
Proussaefs, P [1 ]
Lozada, J [1 ]
机构
[1] Loma Linda Univ, Sch Dent, Grad Program Implant Dent, Loma Linda, CA 92350 USA
来源
JOURNAL OF PROSTHETIC DENTISTRY | 2002年 / 87卷 / 05期
关键词
D O I
10.1067/mpr.2002.123985
中图分类号
R78 [口腔科学];
学科分类号
1003 ;
摘要
This article describes the fabrication of a provisional implant-supported, screw-retained restoration for immediate loading of a completely edentulous arch. The technique can be applied to patients with partially, edentulous arches as well. Until immediate loading of dental implants becomes a well-documented treatment modality, the described method should not be applied on a routine basis or without careful evaluation.
引用
下载
收藏
页码:473 / 476
页数:4
相关论文
共 50 条
  • [1] Fabrication of a screw-retained, implant-supported, provisional prosthesis: A clinical report
    Park, CJ
    Kim, DS
    Yi, YJ
    Cho, LR
    JOURNAL OF PROSTHETIC DENTISTRY, 2004, 91 (05): : 409 - 413
  • [2] Immediate loading with fixed screw-retained provisional restorations in edentulous jaws: The pickup technique
    Gallucci, GO
    Bernard, JP
    Bertosa, M
    Belser, UC
    INTERNATIONAL JOURNAL OF ORAL & MAXILLOFACIAL IMPLANTS, 2004, 19 (04) : 524 - 533
  • [3] Implant-Supported, Bar-Retained Maxillary Overdenture and Mandibular Implant-Supported, Metal-Acrylic Resin, Screw-Retained, Fixed Complete Denture on an Edentulous Patient: Case Report
    Fahmi, Mohammed
    JOURNAL OF ORAL IMPLANTOLOGY, 2024, 50 (04) : 335 - 348
  • [4] The anterior cantilever in the implant-supported screw-retained mandibular prosthesis
    Brosky, AE
    Korioth, TWP
    Hodges, J
    JOURNAL OF PROSTHETIC DENTISTRY, 2003, 89 (03): : 244 - 249
  • [5] The Effect of Two Different Immediate Loading Protocols in Implant-Supported Screw-Retained Prostheses
    Khorshid, Heba E.
    Hamed, Hamdy Aboul Fotouh
    Aziz, Essam A.
    IMPLANT DENTISTRY, 2011, 20 (02) : 157 - 166
  • [6] Fabrication of a screw-retained fixed provisional prosthesis supported by dental implants
    Kökat, AM
    Akça, K
    JOURNAL OF PROSTHETIC DENTISTRY, 2004, 91 (03): : 293 - 297
  • [7] A TECHNIQUE FOR INDIRECT FABRICATION OF AN IMPLANT-SUPPORTED, SCREW-RETAINED, FIXED PROVISIONAL RESTORATION IN THE ESTHETIC ZONE
    Lin, Wei-Shao
    Ercoli, Carlo
    JOURNAL OF PROSTHETIC DENTISTRY, 2009, 102 (06): : 393 - 396
  • [8] A Technique to Fabricate an Interim Implant-Supported Fixed Complete Denture for Immediate Loading
    Ozan, Oguz
    Pekperdahci, Tolga
    Kocyigit, Doruk
    Yilmaz, Burak
    JOURNAL OF ORAL IMPLANTOLOGY, 2021, 47 (04) : 318 - 323
  • [9] An Early Loaded Implant-Supported Mandibular Complete Arch Fixed Prosthesis in a Young Completely Edentulous Patient: A Case Report
    Mathew, Miriam
    John, Bobby
    George, Arun
    JOURNAL OF ORAL IMPLANTOLOGY, 2013, 39 (04) : 487 - 495
  • [10] Fabrication of a duplicate screw-retained complete arch fixed dental prosthesis
    Thammasithiboon, Prasith
    Verrett, Ronald G.
    JOURNAL OF PROSTHETIC DENTISTRY, 2008, 100 (02): : 159 - 161