A column generation-based exact solution method for seru scheduling problems

被引:26
|
作者
Zhang, Zhe [1 ]
Gong, Xue [1 ]
Song, Xiaoling [1 ]
Yin, Yong [2 ]
Lev, Benjamin [3 ]
Chen, Jie [1 ]
机构
[1] Nanjing Univ Sci & Technol, Sch Econ & Management, Nanjing 210094, Peoples R China
[2] Doshisha Univ, Grad Sch Business, Kamigyo Ku, Kyoto 6028580, Japan
[3] Drexel Univ, LeBow Coll Business, Decis Sci Dept, Philadelphia, PA 19104 USA
关键词
Seru scheduling; Dantzig-Wolfe decomposition; Column generation; Branch-and-bound; LINE-CELL CONVERSION; BRANCH-AND-PRICE; NUMERICAL-ANALYSIS; ALGORITHM; DECOMPOSITION; MODELS;
D O I
10.1016/j.omega.2021.102581
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper attempts to address production scheduling problems in seru production systems (SPS), which is a new-type manufacturing system emanating from Japanese electronic assembly industry. As a typical parallel production system, SPS has high efficiency, good flexibility, and rapid responsiveness, which are achieved by reconfiguring serus, increasing, or decreasing workers to adjust the output in practical volatile markets. The seru scheduling problem in this paper is formulated as an integer programming (IP) model to minimize the total weighted completion time (TWCT). Then, by employing the Dantzig-Wolfe decomposition, the proposed IP model is reformulated into a set partitioning problem with a master problem and several subproblems. A branch-and-bound (B&B) algorithm is designed, and each node in a B&B tree is a linear relaxation problem (LRP) of the set partitioning problem. The LRP is solved by a column generation approach, in which each column is generated to represent a schedule of the seru in SPS based on solving the subproblems. Computational experiments are conducted, and the results indicate that the proposed column generation-based exact solution method is promising in solving the seru scheduling problem effectively.(c) 2021 Elsevier Ltd. All rights reserved.
引用
收藏
页数:10
相关论文
共 50 条
  • [1] Applied column generation-based approach to solve supply chain scheduling problems
    Chang, Yung-Chia
    Chang, Kuei-Hu
    Chang, Teng-Kai
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (13) : 4070 - 4086
  • [2] A Column Generation-Based Gossip Algorithm for Home Healthcare Routing and Scheduling Problems
    Riazi, Sarmad
    Wigstrom, Oskar
    Bengtsson, Kristofer
    Lennartson, Bengt
    [J]. IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2019, 16 (01) : 127 - 137
  • [3] An Exact Column Generation-Based Algorithm for Bi-objective Vehicle Routing Problems
    Glize, Estele
    Jozefowiez, Nicolas
    Ngueveu, Sandra Ulrich
    [J]. COMBINATORIAL OPTIMIZATION, ISCO 2018, 2018, 10856 : 208 - 218
  • [4] A Column Generation-based Crew Scheduling Optimization Method for Urban Rail Transit
    Xu Z.
    Du P.
    [J]. Tiedao Xuebao/Journal of the China Railway Society, 2019, 41 (03): : 25 - 32
  • [5] An exact solution method for seru scheduling problems with multiple rate-modifying activities and learning effect
    Jiang, Yujing
    Zhang, Zhe
    Gong, Xue
    Yin, Yong
    [J]. EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2024, 18 (04) : 469 - 511
  • [6] A Column Generation-Based Approach for Railway Crew Scheduling Problem
    Wang, Ying
    Liu, Jun
    Miao, Jianrui
    Nie, Lei
    [J]. TRAFFIC AND TRANSPORTATION STUDIES, 2008, : 697 - 708
  • [7] An exact quadratic programming approach based on convex reformulation for seru scheduling problems
    Zhang, Zhe
    Song, Xiaoling
    Gong, Xue
    Yin, Yong
    Lev, Benjamin
    Zhou, Xiaoyang
    [J]. NAVAL RESEARCH LOGISTICS, 2022, 69 (08) : 1096 - 1107
  • [8] A column generation-based heuristic for a rehabilitation patient scheduling and routing problem
    Xiao, Liyang
    Zhen, Lu
    Laporte, Gilbert
    Baldacci, Roberto
    Wang, Chenghao
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2022, 148
  • [9] Reformulation and exact solution method for seru scheduling problem with learning effect and job deterioration
    Zhang R.
    Zhang Z.
    Gong X.
    Yin Y.
    [J]. International Journal of Applied Decision Sciences, 2023, 16 (05) : 613 - 645
  • [10] An exact solution method for seru scheduling problems considering past-sequence-dependent setup time and adjustment activities
    Zhang R.
    Zhang Z.
    Song X.
    Yin Y.
    [J]. International Journal of Applied Decision Sciences, 2024, 17 (02) : 156 - 181