Approach and challenges for the seismic hazard assessment of nuclear power plants: the Swiss experience

被引:20
|
作者
Renault, P. [1 ]
机构
[1] Swissnuclear, CH-4601 Olten, Switzerland
关键词
PEGASOS; PSHA; probabilistic risk assessment; nuclear power plant; Switzerland; GROUND-MOTION PREDICTION; ATTENUATION RELATIONS; EQUATIONS; MODELS; ROCK; SWITZERLAND;
D O I
10.4430/bgta0089
中图分类号
P3 [地球物理学]; P59 [地球化学];
学科分类号
0708 ; 070902 ;
摘要
The PEGASOS project, a new state-of-the-art probabilistic seismic hazard assessment for the nuclear power plant sites in Switzerland has been carried out from 2000 to 2004. The quantification of the epistemic uncertainty and aleatory variability in seismic hazard at the four Swiss nuclear power plant sites was the key aspect of the PEGASOS project. After the completion of the project, the Swiss utilities decided to perform a refinement of the study by collecting additional data and using new advances in science, especially in the field of ground motion modeling, to further reduce the identified uncertainties. This paper gives an overview of the different components of the project, the used approaches and also identifies some new challenges for the scientific community. An important aspect being: the adjustment of ground motion prediction equations in order to make them applicable to the study region. The importance of those adjustments and their significant impact on PSHA results are also illustrated.
引用
收藏
页码:149 / 164
页数:16
相关论文
共 50 条
  • [1] Seismic Hazard Assessment for Nuclear Power Plants: How to Cope with Rare Events?
    Tatevossian, Ruben
    [J]. JOURNAL OF THE GEOLOGICAL SOCIETY OF INDIA, 2021, 97 (12) : 1504 - 1507
  • [2] Seismic Hazard Assessment for Nuclear Power Plants: How to Cope with Rare Events?
    Ruben Tatevossian
    [J]. Journal of the Geological Society of India, 2021, 97 : 1504 - 1507
  • [3] Seismic Hazard Resiliency at US Nuclear Power Plants
    Reitenbach, Gail
    Hylko, James
    [J]. POWER, 2015, 159 (04) : 86 - 93
  • [4] A streamlined approach for the seismic hazard assessment of a new nuclear power plant in the UK
    Guillermo Aldama-Bustos
    Iain J. Tromans
    Fleur Strasser
    Graham Garrard
    Guy Green
    Liz Rivers
    John Douglas
    Roger M. W. Musson
    Simon Hunt
    Angeliki Lessi-Cheimariou
    Manuela Daví
    Colin Robertson
    [J]. Bulletin of Earthquake Engineering, 2019, 17 : 37 - 54
  • [5] A streamlined approach for the seismic hazard assessment of a new nuclear power plant in the UK
    Aldama-Bustos, Guillermo
    Tromans, Iain J.
    Strasser, Fleur
    Garrard, Graham
    Green, Guy
    Rivers, Liz
    Douglas, John
    Musson, Roger M. W.
    Hunt, Simon
    Lessi-Cheimariou, Angeliki
    Davi, Manuela
    Robertson, Colin
    [J]. BULLETIN OF EARTHQUAKE ENGINEERING, 2019, 17 (01) : 37 - 54
  • [6] OPERATING EXPERIENCE WITH SWISS NUCLEAR-POWER PLANTS
    WUTHRICH, H
    SPAARGAREN, B
    [J]. BROWN BOVERI REVIEW, 1976, 63 (01): : 17 - 21
  • [7] PROBABILISTIC ASSESSMENT OF THE SEISMIC HAZARD FOR EASTERN UNITED-STATES NUCLEAR-POWER-PLANTS
    SAVY, J
    BERNREUTER, D
    MENSING, R
    [J]. NUCLEAR ENGINEERING AND DESIGN, 1990, 123 (2-3) : 99 - 109
  • [8] SEISMIC DESIGN OF NUCLEAR-POWER PLANTS - ASSESSMENT
    HOWARD, GE
    IBANEZ, P
    SMITH, CB
    [J]. NUCLEAR ENGINEERING AND DESIGN, 1976, 38 (03) : 385 - 461
  • [9] PROBABILISTIC ASSESSMENT OF SEISMIC RISK FOR NUCLEAR POWER PLANTS
    CHALAPAT.CV
    WALL, IB
    [J]. TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1969, 12 (02): : 684 - &
  • [10] PROBABILISTIC ASSESSMENT OF FLOODING HAZARD FOR NUCLEAR-POWER PLANTS
    WALL, IB
    [J]. TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1973, 16 (JUN): : 211 - 212