EARLY WARNING SYSTEM IN LOGISTICS PROJECT MANAGEMENT

被引:0
|
作者
Pisz, Iwona [1 ]
Lapunka, Iwona [2 ]
机构
[1] Opole Univ, Fac Econ, Opole, Poland
[2] Opole Univ Technol, Fac Prod Engn & Logist, Opole, Poland
关键词
Early warning system; weak signals; logistics project; project management; uncertainty; risk;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Risk management is a vital process in all complex logistics project management. We discuss the concept of early warning system EWS dedicated to logistics project, which enable management under the conditions of uncertainty and risk. The complexity and uniqueness of the logistics projects as well as the discontinuity of the effects in the environment of goods and services, significantly impact the inability to eliminate the risks and subsequently lead to changes during execution. The introduction into companies and supply chains things such as: principles, methods, mechanisms of knowledge management and project risk, e.g. by implementing into the logistics project management the early warning systems can minimize the impact of unexpected, at the stage of initiation of the project, negative phenomena. Early information concerning risks enables to eliminate effectively later problems, in meeting the logistics project's schedule and budget, simultaneously constitutes a potential source of opportunities to accelerate the project implementation and project implementation below the assumed budget. The model of the dedicated early warning system should help policy-makers (logisticians) at the stage of the logistics project's planning and implementation, enabling undertaking decisions regarding its accomplishment and elaboration of the response plan in the case of appearance of a particular type of risk. Early warning system should aid logisticians with logistics project management undertaken in an company or in a supply chain. The developed approach extends previous work by the authors.
引用
收藏
页码:676 / 681
页数:6
相关论文
共 50 条
  • [1] EARLY WARNING AND CRISIS MANAGEMENT SYSTEM PROJECT
    不详
    [J]. GRADEVINAR, 2020, 72 (09): : 841 - 842
  • [2] Theoretical Framework for Early Warning System in Project Management
    Pisz, Iwona
    Lapunka, Iwona
    Wittbrodt, Piotr
    [J]. INNOVATION MANAGEMENT AND EDUCATION EXCELLENCE VISION 2020: FROM REGIONAL DEVELOPMENT SUSTAINABILITY TO GLOBAL ECONOMIC GROWTH, VOLS I - VI, 2016, : 1038 - 1048
  • [3] An intelligent early warning system for software quality improvement and project management
    Liu, XQ
    Kane, G
    Bambroo, M
    [J]. 15TH IEEE INTERNATIONAL CONFERENCE ON TOOLS WITH ARTIFICIAL INTELLIGENCE, PROCEEDINGS, 2003, : 32 - 38
  • [4] An intelligent early warning system for software quality improvement and project management
    Liu, Xiaoqing
    Kane, Gautam
    Bambroo, Monu
    [J]. JOURNAL OF SYSTEMS AND SOFTWARE, 2006, 79 (11) : 1552 - 1564
  • [5] Design of Early Warning Indicator System of Enterprise Logistics Risk Based on Supply Chain Management
    Liu, Yongsheng
    Ji, Li
    [J]. ICICTA: 2009 SECOND INTERNATIONAL CONFERENCE ON INTELLIGENT COMPUTATION TECHNOLOGY AND AUTOMATION, VOL III, PROCEEDINGS, 2009, : 918 - 923
  • [6] Maternal Early Warning System Optimization Project
    Park, Mi
    Middleton, Teena
    Jones, Kimberly
    Noguerra, Maria
    [J]. JOGNN-JOURNAL OF OBSTETRIC GYNECOLOGIC AND NEONATAL NURSING, 2023, 52 (04): : S48 - S48
  • [7] Design for an Early Warning Index System of the Risk in Logistics Operation
    Zhang, Guohua
    Dou, Hairong
    [J]. ECBI: 2009 INTERNATIONAL CONFERENCE ON ELECTRONIC COMMERCE AND BUSINESS INTELLIGENCE, PROCEEDINGS, 2009, : 217 - 220
  • [8] Early Warning Index System for Logistics Service Operating Risks
    Cheng, Qi
    Shui, Zhangjin
    [J]. NINTH WUHAN INTERNATIONAL CONFERENCE ON E-BUSINESS, VOLS I-III, 2010, : 2456 - 2461
  • [9] Study on the pattern of integrated risk management in project contracting and early-warning system
    Wan Li
    Liu Ruiyu
    [J]. PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON RISK MANAGEMENT & GLOBAL E-BUSINESS, VOLS I AND II, 2009, : 290 - 295
  • [10] Early-warning management of inner logistics risk in SMEs based on label-card system
    Xie, Kefan
    Liu, Jieming
    Peng, Huatao
    Chen, Gang
    Chen, Yun
    [J]. PRODUCTION PLANNING & CONTROL, 2009, 20 (04) : 306 - 319