Lot splitting to minimize average flow-time in two-machine flow-shop

被引:18
|
作者
Bukchin, J [1 ]
Tzur, M
Jaffe, M
机构
[1] Tel Aviv Univ, Dept Ind Engn, IL-69978 Tel Aviv, Israel
[2] EL AL Israel Airlines Ltd, IL-70100 Ben Gurion, Israel
关键词
D O I
10.1023/A:1016130629956
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Lot splitting is technique for accelerating the flow of work by splitting job lots into sublots. In this paper we investigate the lot splitting scheduling problem in two-machine flow-shop environment with detached setups and with batch availability. The performance measure considered is the average flow-time which is indicative of the increasingly important manufacturing lead-time. Our contribution is both theoretic and practical for the case of general ( not necessarily equal) sublots. We identify properties of the optimal solution and develop solution procedure to solve the problem. We then present computational study which indicates that our solution technique is very efficient.
引用
收藏
页码:953 / 970
页数:18
相关论文
共 50 条
  • [1] Two-machine flow-shop scheduling to minimize total late work
    Lin, B. M. T.
    Lin, F. C.
    Lee, R. C. T.
    [J]. ENGINEERING OPTIMIZATION, 2006, 38 (04) : 501 - 509
  • [2] Two-machine flow-shop scheduling to minimize total late work: revisited
    Chen, Xin
    Wang, Zhongyu
    Pesch, Erwin
    Sterna, Malgorzata
    Blazewicz, Jacek
    [J]. ENGINEERING OPTIMIZATION, 2019, 51 (07) : 1268 - 1278
  • [3] Two-machine flow-shop scheduling with rejection
    Shabtay, Dvir
    Gasper, Nufar
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2012, 39 (05) : 1087 - 1096
  • [4] Minimizing tardiness in a two-machine flow-shop
    Pan, JCH
    Chen, JS
    Chao, CM
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2002, 29 (07) : 869 - 885
  • [5] Exact method for the two-machine flow-shop problem with time delays
    Mohamed Amine Mkadem
    Aziz Moukrim
    Mehdi Serairi
    [J]. Annals of Operations Research, 2021, 298 : 375 - 406
  • [6] Exact method for the two-machine flow-shop problem with time delays
    Mkadem, Mohamed Amine
    Moukrim, Aziz
    Serairi, Mehdi
    [J]. ANNALS OF OPERATIONS RESEARCH, 2021, 298 (1-2) : 375 - 406
  • [7] Inverse scheduling: two-machine flow-shop problem
    Peter Brucker
    Natalia V. Shakhlevich
    [J]. Journal of Scheduling, 2011, 14 : 239 - 256
  • [8] Inverse scheduling: two-machine flow-shop problem
    Brucker, Peter
    Shakhlevich, Natalia V.
    [J]. JOURNAL OF SCHEDULING, 2011, 14 (03) : 239 - 256
  • [9] Clarification of lower bounds of two-machine flow-shop scheduling to minimize total late work
    Blazewicz, Jacek
    Chen, Xin
    Lee, Richard C. T.
    Lin, Bertrand M. T.
    Lin, Feng-Cheng
    Pesch, Erwin
    Sterna, Malgorzata
    Wang, Zhongyu
    [J]. ENGINEERING OPTIMIZATION, 2019, 51 (07) : 1279 - 1280
  • [10] New results on two-machine flow-shop scheduling with rejection
    Liqi Zhang
    Lingfa Lu
    Shisheng Li
    [J]. Journal of Combinatorial Optimization, 2016, 31 : 1493 - 1504