Performance analysis of auction-based distributed shop-floor control schemes from the perspective of the communication system

被引:24
|
作者
Veeramani, D
Wang, KJ
机构
[1] Department of Industrial Engineering, University of Wisconsin - Madison, Madison
基金
美国国家科学基金会;
关键词
distributed shop-floor control; communication systems; performance analysis;
D O I
10.1023/A:1007985017305
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A growing level of interest in academia and industry centers on the paradigm of distributed shop-floor control in which task and resource allocation in the manufacturing system is accomplished in a distributed manner through message passing and auction-based decision making among autonomous entities. Due to the prominent role played by the communication system in this paradigm, it is important to consider the requirements and performance characteristics of the communication system during the design and evaluation of distributed shop-floor control schemes. In this paper, we propose a two-phase methodology for analyzing auction-based shop-floor control schemes from the perspective of the communication system. In the first phase, the control scheme is modeled as a closed queueing network and performance measures related to the auctioning process and the communication system are obtained rapidly using asymptotic bounding analysis and mean value analysis. Control schemes identified as attractive in the first phase are then evaluated in greater detail during the second phase, using a discrete event simulation model. We illustrate this methodology using two-class and four-class control schemes and discuss insights learned about the impact of various control-scheme-related factors on the performance of the auctioning process and the communication system.
引用
下载
收藏
页码:121 / 143
页数:23
相关论文
共 17 条
  • [1] Performance Analysis of Auction-Based Distributed Shop-Floor Control Schemes from the Perspective of the Communication System
    Dharmaraj Veeramani
    Kung-Jeng Wang
    International Journal of Flexible Manufacturing Systems, 1997, 9 : 121 - 143
  • [2] Modeling and simulation of auction-based shop-floor control using parallel computing
    Veeramani, D
    Wang, KJ
    Rojas, J
    IIE TRANSACTIONS, 1998, 30 (09) : 773 - 783
  • [3] Agent-based shop-floor control system in a dynamic environment
    Alpay, Serafettin
    Saricicek, Inci
    PROCEEDINGS OF THE FIFTH INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY: NEW GENERATIONS, 2008, : 414 - 419
  • [4] An Internet of Things-Based Monitoring System for Shop-Floor Control
    Mourtzis, Dimitris
    Milas, Nikolaos
    Vlachou, Aikaterini
    JOURNAL OF COMPUTING AND INFORMATION SCIENCE IN ENGINEERING, 2018, 18 (02)
  • [5] Shop-floor communication and process management for quality performance An empirical analysis of quality management
    Zeng, Jing
    Phan Chi Anh
    Matsui, Yoshiki
    MANAGEMENT RESEARCH REVIEW, 2013, 36 (05): : 454 - 477
  • [6] Distributed feedback control algorithm in an auction-based manufacturing planning and control system
    Wang, Li-Chih
    Cheng, Chen-Yang
    Lin, Sian-Kun
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (09) : 2667 - 2679
  • [7] CONCEPTUAL DESIGN OF A SHOP-FLOOR CONTROL-SYSTEM FROM IDEF(0)
    GONG, DC
    LIN, KF
    COMPUTERS & INDUSTRIAL ENGINEERING, 1994, 27 (1-4) : 119 - 122
  • [8] Critical Event Based Real-time Shop-floor Production Performance Analysis
    Zhang, Yingfeng
    Wang, Wenbo
    2014 IEEE 11TH INTERNATIONAL CONFERENCE ON NETWORKING, SENSING AND CONTROL (ICNSC), 2014, : 428 - 431
  • [9] Digital Twin-based Production Simulation of Discrete Manufacturing Shop-floor for Onsite Performance Analysis
    Zhang, Y. F.
    Shao, Y. Q.
    Wang, J. F.
    Li, S. Q.
    2020 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEE IEEM), 2020, : 1107 - 1111
  • [10] Rapid development of a distributed shop floor control system from an XML model-based control software specification
    Shin, J
    Cho, H
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2006, 44 (02) : 329 - 350