The design and implementation of the Top of Block 4 (TOB 4)/Bop resource at Finsch Mine (a division of Central Mines)

被引:0
|
作者
Mathebula, V [1 ]
机构
[1] Technikon Witwatersrand, Sch Mines, Johannesburg, South Africa
关键词
Cost effectiveness - Extraction - Mining machinery - Production engineering - Project management - Strategic planning - Tunnels;
D O I
暂无
中图分类号
TF [冶金工业];
学科分类号
0806 ;
摘要
The purpose of this study is to establish whether to mine the Bottom of Pit (BOP) /TOB 4 reserve before the commencement of the Block Cave or whether this should be disregarded and the reserve be extracted at the end of the life of the Cave. The primary goal of this report is to investigate and propose a practical mining method to safely extract the reserve given the set constraints. This report quantifies the additional revenue the TOB 4 will contribute to Finsch's overall NPV thus enhancing Finsch's business case and strategically enhancing the SBP. Several underground mining options have been investigated. The proposed mining method includes the installation of a series of extraction tunnels below the TOB 4 reserve from 53 level, with a slot access tunnel system. Ground will be loaded by LHDs from the drawpoints and tipped into 50-ton dumptrucks at a transfer point, from there the ground will be transported to 53 level No. 1 groundpass where it will join the existing ground-handling system. Primary development is scheduled to begin October 2002 and last for a period of approximately 7 months until early April 2003. The production is broken into 4 phases. Phase I is scheduled to begin mid-April 2003. The final production phase will be completed by November 2005. The production scheduling has been designed in order to remain ahead of the Block 4 undercut in order to ensure stability and safety. Due cognisance was taken of the health and safety of all employees concerned during the design of the mining and ground-handling processes for the Bottom of Pit, As far as is reasonably practicable, the BOP was designed and will be constructed and equipped to provide conditions for the safe operation of machinery and a healthy working environment for people underground. Relevant requirements of the Mine Health and Safety Act regulations pertaining to mining operations have been identified and adhered to during all phases of the design process.
引用
收藏
页码:163 / 170
页数:8
相关论文
共 6 条
  • [1] Secondary breaking strategy for block 4 at De Beers Finsch Mine
    Hull, RD
    JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY, 2002, 102 (02): : 101 - 108
  • [2] Design and Implementation of a Radix-4 Complex Division Unit with Prescaling
    Dormiani, Pouya
    Ercegovac, Milos D.
    Muller, Jean-Michel
    2009 20TH IEEE INTERNATIONAL CONFERENCE ON APPLICATION-SPECIFIC SYSTEMS, ARCHITECTURES AND PROCESSORS, 2009, : 83 - +
  • [3] Design and Implementation of the Block Cipher-SMS4 IP Core
    Wang Bin
    Lan Ju-long
    Guo Yun-fei
    Zhang Yuan-yang
    MATERIALS AND MANUFACTURING TECHNOLOGY, PTS 1 AND 2, 2010, 129-131 : 881 - +
  • [4] Design and implementation of parallel radix-4 MSD iterative division of ternary optical computer
    Shen, Yunfu
    Zhang, Sulan
    Wang, Zhehe
    Li, Weimin
    OPTICS COMMUNICATIONS, 2021, 501
  • [5] Design and Implementation of Time Division-Fourth Generation (TD-4G) Gigabit Speed Wireless Communication System
    Zhang, Jianhua
    Nie, Weiqing
    Zhang, Zhiyan
    Wang, Qiang
    Zhang, Ping
    2010 5TH INTERNATIONAL ICST CONFERENCE ON COMMUNICATIONS AND NETWORKING IN CHINA (CHINACOM), 2010,
  • [6] VLSI Implementation of an Adaptive Block Partition Decision Object-Detection Design for Real-Time 4K2K Video Display
    Chen, Shih-Lun
    Tuan, Min-Chun
    JOURNAL OF DISPLAY TECHNOLOGY, 2016, 12 (12): : 1570 - 1580