An imperialist competitive algorithm in mixed-model assembly line sequencing problem to minimise unfinished works

被引:10
|
作者
Zandieh, M. [1 ]
Moradi, Hadi [2 ]
机构
[1] Shahid Beheshti Univ, GC, Management & Accounting Fac, Dept Ind Management, Tehran, Iran
[2] Sharif Univ Technol, Dept Ind Engn, Tehran, Iran
关键词
Sequencing; mixed-model assembly line; JIT; ICA; GA; GRASP;
D O I
10.1080/23302674.2017.1401152
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Mixed-model assembly lines (MMALs) are a type of production lines where a variety of product models similar to product characteristics are assembled in a just-in-time production system. Usually, MMAL consists of a number of stations linked by a conveyor belt and each station has a work zone limited by upstream and downstream boundaries. To avoid improper interference between operators in the adjacent stations and excess of machine moving range, operators are forced to complete their operations within their predetermined work zone. There is a set of criteria on which to judge sequences of product models in terms of the effective utilisation of these lines. In this paper, the sequence of models for minimising the total unfinished work within their work zone is discussed. A novel imperialist competitive algorithm (ICA) is developed for solving this problem in small-, medium- and large-scale problems. The solutions obtained via ICA are compared against solutions obtained via B&B, a heuristic procedure, GRASP and BDP-2 in small problems, and also against a proposed genetic algorithm and a simulated annealing in small, medium and large problems. Experimental results show that this algorithm provides reasonably good solutions with low computational costs.
引用
收藏
页码:179 / 192
页数:14
相关论文
共 50 条
  • [1] An imperialist competitive algorithm for a mixed-model assembly line sequencing problem
    Moradi, Hadi
    Zandieh, M.
    [J]. JOURNAL OF MANUFACTURING SYSTEMS, 2013, 32 (01) : 46 - 54
  • [2] Product sequencing problem in Mixed-Model Assembly Line to minimize unfinished works
    Kim, Siwon
    Jeong, Bonju
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2007, 53 (02) : 206 - 214
  • [3] Optimal production sequencing problem to minimise line stoppage time in a mixed-model assembly line
    Tamura, Takayoshi
    Okumura, Taiji
    Dhakar, Tej Singh
    Ohno, Katsuhisa
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (14) : 4299 - 4315
  • [4] An adaptive genetic algorithm approach for the mixed-model assembly line sequencing problem
    Akgunduz, Onur Serkan
    Tunali, Semra
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2010, 48 (17) : 5157 - 5179
  • [5] A HYBRID ELECTROMAGNETISM-LIKE ALGORITHM FOR A MIXED-MODEL ASSEMBLY LINE SEQUENCING PROBLEM
    Yan, Hong-Sen
    Jiang, Tian-Hua
    Xiong, Fu-Li
    [J]. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2014, 21 (03): : 153 - 167
  • [6] A hybrid electromagnetism-like algorithm for a mixed-model assembly line sequencing problem
    Yan, Hong-Sen
    Jiang, Tian-Hua
    Xiong, Fu-Li
    [J]. International Journal of Industrial Engineering : Theory Applications and Practice, 2014, 21 (03): : 153 - 167
  • [7] A modified colonial competitive algorithm for the mixed-model U-line balancing and sequencing problem
    Lian, Kunlei
    Zhang, Chaoyong
    Gao, Liang
    Shao, Xinyu
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (18) : 5117 - 5131
  • [8] Real options approach for a mixed-model assembly line sequencing problem
    Rabbani, Masoud
    Rahimi-Vahed, Alireza
    Torabi, Seyed Ali
    [J]. International Journal of Advanced Manufacturing Technology, 2008, 37 (11-12): : 1209 - 1219
  • [9] Sequencing problem for a mixed-model assembly line in the Toyota production system
    Kotani, S
    Ito, T
    Ohno, K
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2004, 42 (23) : 4955 - 4974
  • [10] A Sequencing Problem for a Mixed-Model Assembly Line on Supply Chain Management
    Hugejile
    Hiraki, Shusaku
    Xu, Zhuqi
    Yang, Shaolan
    [J]. LTLGB 2012: PROCEEDINGS OF INTERNATIONAL CONFERENCE ON LOW-CARBON TRANSPORTATION AND LOGISTICS, AND GREEN BUILDINGS. VOL 1, 2013, : 481 - 487