New controllable processing time scheduling with subcontracting strategy for no-wait job shop problem

被引:9
|
作者
Gao, Jinsheng [1 ]
Zhu, Xiaomin [1 ]
Bai, Kaiyuan [1 ]
Zhang, Runtong [2 ]
机构
[1] Beijing Jiaotong Univ, Sch Mech Elect & Control Engn, Beijing, Peoples R China
[2] Beijing Jiaotong Univ, Sch Econ & Management, Beijing, Peoples R China
基金
中国国家自然科学基金; 北京市自然科学基金;
关键词
Job shop scheduling; no-wait; controllable processing time; subcontracting strategy; integer programming; artificial bee colony algorithm;
D O I
10.1080/00207543.2021.1886368
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper addresses the no-wait job shop scheduling problem with due date and subcontracting cost constraints. For the no-wait job shop problem, it does not allow for waiting or interruption between any two consecutive operations of the same job. Considering the deadline and controllable processing time requirements in the real world, due date and subcontracting cost constraints are integrated into the problem as a new extension. The problem has two objectives which are associated with makespan and subcontracting cost. The extended problem focuses on a special case that some jobs cannot satisfy their deadlines no matter how they are scheduled. To satisfy the deadlines, a subcontracting strategy, i.e. buying semi-finished products for processing, is put forward. Two mathematical models are proposed. One is an integrated MILP (MILP-IS), and the other is a rolling time line MILP (MILP-RTL). According to the idea of rolling time line, an artificial bee colony algorithm based on rolling time line (RTL-ABC) is developed. Comprehensive computational analysis is carried out. For small size problems, the optimal solutions are obtained by using these two mathematical models. For large size problems, RTL-ABC is able to find good-quality solutions in a reasonable time and improves the best-found solutions.
引用
收藏
页码:2254 / 2274
页数:21
相关论文
共 50 条
  • [1] Efficient scheduling of a stochastic no-wait job shop with controllable processing times
    Aschauer, Alexander
    Roetzer, Florian
    Steinboeck, Andreas
    Kugi, Andreas
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2020, 162
  • [2] Inapproximability results for no-wait job shop scheduling
    Woeginger, GJ
    [J]. OPERATIONS RESEARCH LETTERS, 2004, 32 (04) : 320 - 325
  • [3] The proportionate two-machine no-wait job shop scheduling problem
    Koulamas, Christos
    Panwalkar, S. S.
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2016, 252 (01) : 131 - 135
  • [4] A cooperative coevolutionary algorithm approach to the no-wait job shop scheduling problem
    Valenzuela-Alcaraz, Victor M.
    Cosio-Leon, M. A.
    Danisa Romero-Ocano, A.
    Brizuela, Carlos A.
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2022, 194
  • [5] Approximative procedures for no-wait job shop scheduling
    Schuster, CJ
    Framinan, JM
    [J]. OPERATIONS RESEARCH LETTERS, 2003, 31 (04) : 308 - 318
  • [6] EDA-Based for the Green No-wait Job Shop Scheduling Problem
    Yao, You-Jie
    Qian, Bin
    Dong, Yu-Ming
    Hu, Rong
    Wang, Ling
    [J]. Tien Tzu Hsueh Pao/Acta Electronica Sinica, 2021, 49 (02): : 225 - 232
  • [7] A Combination of Two Simple Decoding Strategies for the No-wait Job Shop Scheduling Problem
    Valenzuela, Victor M.
    Brizuela, Carlos A.
    Cosio-Leon, M. A.
    Danisa Romero-Ocano, A.
    [J]. PROCEEDINGS OF THE 2019 GENETIC AND EVOLUTIONARY COMPUTATION CONFERENCE (GECCO'19), 2019, : 864 - 871
  • [8] Job-shop scheduling with blocking and no-wait constraints
    Mascis, A
    Pacciarelli, D
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2002, 143 (03) : 498 - 517
  • [9] No-wait two-machine permutation flow shop scheduling problem with learning effect, common due date and controllable job processing times
    Gao, Fu
    Liu, Mengqi
    Wang, Jian-Jun
    Lu, Yuan-Yuan
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (06) : 2361 - 2369
  • [10] No-wait hybrid flow shop scheduling problem based on just in time
    Wang, Li
    Wang, Mengguang
    [J]. Dongbei Daxue Xuebao/Journal of Northeastern University, 1998, 19 (04): : 349 - 351