THE SILVAJ BRIDGE CONSTRUCTION SITE IN Vc CONSTRUCTION AREA The bridge connection Croatian and BiH is being completed

被引:0
|
作者
Bogdan, Andela
机构
来源
GRADEVINAR | 2019年 / 71卷 / 07期
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
引用
收藏
页码:601 / 606
页数:6
相关论文
共 41 条
  • [1] THE LAST SEGMENT OF THE CONSTRUCTION OF THE PELJESKA BRIDGE IS CONNECTED Croatian megaproject - Peljesac bridge
    Kovacevic, Gordana Hrelja
    [J]. GRADEVINAR, 2021, 73 (08): : 845 - 853
  • [2] Investigation of Grouted Coupler Connection Details for Accelerated Bridge Construction
    Phares, Brent
    Lee, Yoon-Si
    Hosteng, Travis K.
    Nelson, Jim
    [J]. TRANSPORTATION RESEARCH RECORD, 2021, 2675 (08) : 562 - 569
  • [3] Tour of the Peljeski bridge construction site and access roads
    Pospisil, Antun
    [J]. GRADEVINAR, 2022, 74 (10): : 925 - 926
  • [4] Precast concrete deck-to-girder mechanical connection for accelerated bridge construction
    Morcous, George
    Tawadrous, Raed
    [J]. PCI JOURNAL, 2020, 65 (03): : 37 - 52
  • [5] Study on Disaster Prevention of Site-Support Method for Bridge Construction
    Shiau Yan-Chyuan
    Song Shu-Jen
    Yang Je-Chen
    Lee Gour-Chin
    [J]. DISASTER ADVANCES, 2012, 5 (04): : 1541 - 1546
  • [6] Research on Design and Construction of Continuous Rigid Frame Bridge in Canyon Area
    Peng, Jingrong
    Jiang, Tianhua
    Peng, Yi
    Jin, Qingping
    [J]. SUSTAINABLE ENVIRONMENT AND TRANSPORTATION, PTS 1-4, 2012, 178-181 : 2539 - 2542
  • [7] On-site tests to estimate aquifer permeability of drainage area of south caisson anchorage construction of Taizhou Bridge
    Feng Zhaoxiang1
    2. School of Earth Sciences and Engineering
    [J]. Engineering Sciences, 2011, 9 (02) : 20 - 25
  • [8] Site Characterization during Bridge Foundation Construction Using Electrical Resistivity Tomography
    Torgashov, Evgeniy V.
    Varnavina, Aleksandra V.
    [J]. AIMS GEOSCIENCES, 2016, 2 (03): : 201 - 213
  • [9] The Construction of Cable Force Monitoring System for the Suspender Arch Bridge in Cold Area
    Shan, Jing-hui
    Liu, Han-bing
    Tan, Guo-jin
    [J]. 2017 IEEE 7TH ANNUAL INTERNATIONAL CONFERENCE ON CYBER TECHNOLOGY IN AUTOMATION, CONTROL, AND INTELLIGENT SYSTEMS (CYBER), 2017, : 908 - 913
  • [10] The new Rhine Bridge Wesel in the course of the B 58n is being under construction
    Gebert, Gregor
    Bohm, Stefan
    Sprinke, Peter
    Hamme, Markus
    Loeckmann, Hans
    Reinsch, Helmut
    [J]. STAHLBAU, 2007, 76 (09) : 657 - 670