Schoolhouse wastewater purification in a LWA-filled hybrid constructed wetland in Estonia

被引:85
|
作者
Oovel, Mart
Tooming, Antti
Mauring, Tonu
Mander, Ulo
机构
[1] Univ Tartu, Inst Geog, EE-51014 Tartu, Estonia
[2] Ctr Ecol Engn Tartu, EE-51014 Tartu, Estonia
关键词
BOD; hybrid constructed wetland; k-C* model; LWA; mass removal; nitrogen; phosphorus; treatment efficiency;
D O I
10.1016/j.ecoleng.2006.07.010
中图分类号
Q14 [生态学(生物生态学)];
学科分类号
071012 ; 0713 ;
摘要
This paper analyses the purification efficiency and mass removal of organic material, suspended solids, nitrogen and phosphorus in a hybrid constructed wetland (CW) system treating wastewater from a basic school in Paistu, Estonia. The CW consists of two subsurface flow filter beds using lightweight aggregates (LWA): a two-chamber vertical subsurface flow (VSSF) filter bed followed by a horizontal subsurface flow (HSSF) filter bed, with a total area of 432 m(2). This CW was constructed in summer 2002 by the Centre for Ecological Engineering in Tartu (CEET). Eighteen series of water samples (from 30.10.2003 to 15.10.2005) were undertaken. The analyses show the outstanding purification effect of the system: for BOD7 the average purification efficiency is 91%; for total suspended solids (TSS)-78%, for total P-89%, for total N-63%, and for NH4-N-77%. The average outlet values for the above-listed parameters were 5.5, 7.0, 0.4, 19.2 and 9.1 mg L-1, respectively. According to our results, the purification parameters meet the standards set by the Water Act of Estonia for wastewater treatment plants of 2000-9999 PE: 15, 25, and 1.5 mg L-1 for BOD7, TSS and total P, respectively. The results show that hybrid CW systems consisting of subsurface flow filter beds can work efficiently in conditions of changing hydraulic loading and relatively cold climate. We did not find significant differences between the removal efficiency, mass removal, and values of the first-order rate-constant k for most water quality indicators during the warm (May-October) and cold (November-April) periods. Locally produced LWA as a filter material in CWs has shown good hydraulic conductivity and phosphorus sorption capacity (k = 17.1 +/- 12.4 m yr(-1)). The Paistu CW, with its proper design and outstanding purification results, can be considered one of the best systems in Estonia. (c) 2006 Elsevier B.V. All rights reserved.
引用
收藏
页码:17 / 26
页数:10
相关论文
共 50 条
  • [1] Purification of Livestock Wastewater by a Constructed Wetland and Physiological Responses of Wetland Plants to Wastewater Stressors
    Zhang, Yun
    Chen, Jin-fa
    [J]. 2ND INTERNATIONAL CONFERENCE ON ENERGY AND POWER ENGINEERING (EPE 2018), 2018, : 65 - 70
  • [2] The effects of flow regime and temperature on the wastewater purification efficiency of a pilot hybrid constructed wetland
    Zaytsev, I.
    Nurk, K.
    Poldvere, E.
    Noorvee, A.
    Mander, U.
    [J]. WATER RESOURCES MANAGEMENT IV, 2007, 103 : 423 - +
  • [3] Winery wastewater treatment in a hybrid constructed wetland
    Serrano, L.
    de la Varga, D.
    Ruiz, I.
    Soto, M.
    [J]. ECOLOGICAL ENGINEERING, 2011, 37 (05) : 744 - 753
  • [4] Performance of a hybrid constructed wetland treating piggery wastewater
    Borin, Maurizio
    Politeo, Marco
    De Stefani, Giovanna
    [J]. ECOLOGICAL ENGINEERING, 2013, 51 : 229 - 236
  • [5] Phosphatase and urease activities in constructed wetland and their relationship with purification of wastewater
    Yue Chunlei
    Chang Jie
    Ge Ying
    Jiang Hong
    Li Hepeng
    [J]. FRESENIUS ENVIRONMENTAL BULLETIN, 2008, 17 (8A): : 992 - 996
  • [6] Performance of a novel tidal unsaturated constructed wetland on wastewater purification
    Zhou, Lu-Lu
    Yang, Ting
    Zhuang, Lin-Lan
    Song, Xi-Ran
    Zhang, Jian
    Liang, Shuang
    Huang, Li-Hua
    [J]. JOURNAL OF WATER PROCESS ENGINEERING, 2021, 39
  • [7] Biological effect in the process of wastewater purification by using constructed wetland
    Liang, Wei
    Hu, Hong-Ying
    [J]. Zhongguo Jishui Paishui/China Water and Wastewater, 2003, 19 (10):
  • [8] Effect of Earthworm Eisenia foetida in Constructed Wetland on Purification of Country Wastewater
    Jin, Qiu
    Li, Wei
    Li, Xian-ning
    [J]. 12TH INTERNATIONAL CONFERENCE ON HYDROINFORMATICS (HIC 2016) - SMART WATER FOR THE FUTURE, 2016, 154 : 406 - 411
  • [9] The Performance of Hybrid Constructed Wetland System for Treating the Batik Wastewater
    Rahmadyanti, Erina
    Audina, Oktavia
    [J]. JOURNAL OF ECOLOGICAL ENGINEERING, 2020, 21 (03): : 94 - 103
  • [10] Study on treatment of aquaculture wastewater using a hybrid constructed wetland
    Hu, Jinzhao
    Hu, Rui
    Qi, Dan
    Lu, Xujie
    [J]. 3RD INTERNATIONAL CONFERENCE ON ENERGY MATERIALS AND ENVIRONMENT ENGINEERING, 2017, 61