共 50 条
- [1] Development of manipulator for in-service inspection and maintenance of NPP steam generator [J]. Hedongli Gongcheng, 2008, 5 (109-113):
- [3] STEAM-GENERATOR MAINTENANCE AND REPAIR TECHNIQUES [J]. ATOMWIRTSCHAFT-ATOMTECHNIK, 1990, 35 (02): : 84 - 87
- [4] Service life assessment of the steam generator WWER [J]. RISK, ECONOMY AND SAFETY, FAILURE MINIMISATION AND ANALYSIS: FAILURES '96, 1996, : 329 - 336
- [5] MATRIX STEAM-GENERATOR FOR LMFBR SERVICE [J]. MECHANICAL ENGINEERING, 1977, 99 (01): : 112 - 113
- [6] Remote visual inspection - an eye for steam generator maintenance [J]. Nucl Eng Int, 534 (21-24):
- [7] FORMING A COHESIVE STEAM-GENERATOR MAINTENANCE STRATEGY [J]. NUCLEAR ENGINEERING INTERNATIONAL, 1991, 36 (446): : 51 - 52
- [8] Remote visual inspection - an eye for steam generator maintenance [J]. NUCLEAR ENGINEERING INTERNATIONAL, 1999, 44 (534): : 21 - 24
- [9] RECENT TRENDS IN STEAM-TURBINE GENERATOR MAINTENANCE [J]. MECHANICAL ENGINEERING, 1975, 97 (08): : 82 - 82
- [10] STEAM GENERATOR IN-SERVICE INSPECTIONS AT PAKS NPP [J]. ICONE16: PROCEEDING OF THE 16TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING - 2008, VOL 1, 2008, : 1 - 5