Adaptive Opportunistic Maintenance for Multi-unit Systems Subject to Stochastic Degradation

被引:0
|
作者
Zhu, Zhicheng [1 ]
Xiang, Yisha [2 ]
Jin, Tongdan [3 ]
Li, Mingyang [4 ]
机构
[1] Lamar Univ, Dept Ind Engn, 2608 Cherry Engn Bldg, Beaumont, TX 77710 USA
[2] Lamar Univ, 2626 Cherry Engn Bldg, Beaumont, TX 77710 USA
[3] Texas State Univ, 601 Univ Dr, San Marcos, TX 78666 USA
[4] Univ S Florida, Dept Ind & Management Syst Engn, 4202 E Fowler Ave, Tampa, FL 33620 USA
基金
中国国家自然科学基金;
关键词
opportunistic maintenance; simulation; stochastic degradation; Gamma process;
D O I
暂无
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
failure, the maintenance performed on any component usually incurs a common system setup cost, regardless of the number of components being maintained. Therefore, whenever a component undergoes the maintenance, there is an opportunity to conduct preventive maintenance (PM) on other components even though their degradation does not exceed their own PM thresholds. Thus, simultaneously conducting PM on multiple components can pontential reduce total setup costs, realizing maintenance saving over a long run. Though multi-component maintenance planning has received much attentions in the past decades, most decision models are built upon individual components, such as block-based maintenance and periodic inspection/replacement policy. In this paper, we propose an opportunistic maintenance policy that adaptively adjusts the inspection interval, and the thresholds of PM and opportunistic maintenance based on the degradation of all components. A simulation model is developed to minimize the long-run cost rate by considering the costs associated with inspection, setup, and maintenance actions. Finally, the numerical examples are provided to demonstrate how to optimize the opportunistic maintenance threshold under different setup cost, PM overhead, and reliability parameters.
引用
收藏
页数:7
相关论文
共 50 条
  • [1] Optimal opportunistic maintenance model of multi-unit systems
    Cheng, Zhijun
    Yang, Zheng
    Guo, Bo
    JOURNAL OF SYSTEMS ENGINEERING AND ELECTRONICS, 2013, 24 (05) : 811 - 817
  • [2] Optimal opportunistic maintenance model of multi-unit systems
    Zhijun Cheng
    Zheng Yang
    Bo Guo
    Journal of Systems Engineering and Electronics, 2013, 24 (05) : 811 - 817
  • [3] Maintenance gravity window based opportunistic maintenance scheduling for multi-unit serial systems with stochastic production waits
    Zhou, Xiaojun
    Ning, Xiaohan
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2021, 215
  • [4] A general modeling method for opportunistic maintenance modeling of multi-unit systems
    Zhang, Xiaohong
    Zeng, Jianchao
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2015, 140 : 176 - 190
  • [5] Optimal Inspection and Replacement Policies for Multi-Unit Systems Subject to Degradation
    Sun, Qiuzhuang
    Ye, Zhi-Sheng
    Chen, Nan
    IEEE TRANSACTIONS ON RELIABILITY, 2018, 67 (01) : 401 - 413
  • [6] Opportunistic Preventive Maintenance Optimization for Multi-Unit Series Systems with Combing Multi-Preventive Maintenance Techniques
    周晓军
    陆志强
    奚立峰
    李杰
    JournalofShanghaiJiaotongUniversity(Science), 2010, 15 (05) : 513 - 518
  • [7] Opportunistic preventive maintenance optimization for multi-unit series systems with combing multi-preventive maintenance techniques
    Zhou X.-J.
    Lu Z.-Q.
    Xi L.-F.
    Lee J.
    Journal of Shanghai Jiaotong University (Science), 2010, 15 (05) : 513 - 518
  • [8] A dynamic opportunistic preventive maintenance policy for multi-unit series systems with intermediate buffers
    Zhou X.
    Lu Z.
    Xi L.
    International Journal of Industrial and Systems Engineering, 2010, 6 (03) : 276 - 288
  • [9] Opportunistic Maintenance Strategy for Multi-Unit Serial Systems Based on Dual Time Window
    Yu M.
    Shi K.
    Zhou X.
    Shanghai Jiaotong Daxue Xuebao/Journal of Shanghai Jiaotong University, 2020, 54 (01): : 69 - 75
  • [10] Opportunistic group maintenance optimization of multi-unit system under dependence
    Yang, Yuan
    Li, Fang
    Hou, Chong-Yuan
    Yang, Lei
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2012, 18 (04): : 827 - 832