Smectites: The key to the cost overruns in the construction of the third set of locks of the Panama Canal

被引:3
|
作者
Suarez, Mercedes [1 ]
Garcia-Romero, Emilia [2 ,3 ]
Baz, Ascension [4 ]
Perez, Rafael [4 ]
机构
[1] Univ Salamanca, Dept Geol, Salamanca 37008, Spain
[2] Univ Complutense Madrid, Dept Mineral & Petrol, Madrid 28040, Spain
[3] Univ Complutense Madrid, IGEO, Madrid 28040, Spain
[4] SACYR Construct, Madrid, Spain
关键词
Smectite; Basalt; Aggregates; Rapid degradation; Texture; Swelling clays; Accelerated aging; ROCK CHEMISTRY;
D O I
10.1016/j.enggeo.2021.106036
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
The third set of locks of the Panama Canal is one the most impressive civil infrastructures in the world. Its construction, however, was delayed by two years incurring cost overruns in billions that were mainly related to the use of the local basalt as the raw material for concrete production. The rapid degradation during the construction of an apparent sound basalt resulted in the huge loss of fines during the manufacturing of concrete. In the rock, olivine and glass are, respectively, altered to iddingsite and palagonite that are mainly composed of smectites. Smectites are also found around plagioclase and pyroxene crystals and filling the dense network of micro- and nano-cracks. Moreover, these smectites are spatially interconnected, which is the key to explaining the unexpected behavior and the rapid degradation of the basalt. Such a rapid degradation of basic igneous rocks - exposed to the weather and then utilized as a construction material - is not frequent, yet it is significant enough to call for the development of a new standard for the use of these materials in construction.
引用
收藏
页数:12
相关论文
共 9 条
  • [1] Construction of third set of locks for Panama Canal
    Ametller, Sergi
    RIBAGUA-REVISTA IBEROAMERICANA DEL AGUA, 2019, 6 (01) : 16 - 33
  • [2] The panama canal, third set of locks project
    Cipolotti, S.
    Rivista Italiana della Saldatura, 2013, 65 (05): : 729 - 735
  • [3] The expansion of the Panama Canal. The third set of locks
    Garrido, Juan Francisco García
    Revista de Obras Publicas, 2010, 157 (3516): : 7 - 28
  • [4] Ductile Iron Piping Systems Used in the Design and Construction of the Panama Canal Third Set of Locks Project
    Erwin, Jeffrey E.
    Aruna, Remigijus
    Restrepo, Gabriel E.
    PIPELINES 2016 - OUT OF SIGHT, OUT OF MIND, NOT OUT OF RISK, 2016, : 718 - 729
  • [5] Design optimization of the filling/emptying system for the Third Set of Locks of the Panama Canal
    Menendez, A. N.
    Lecertua, E. A.
    Badano, N. D.
    RIBAGUA-REVISTA IBEROAMERICANA DEL AGUA, 2014, 1 (01) : 4 - 13
  • [6] Effect of Inaugurating the Third Set of Locks in the Panama Canal on Vessel Size, Manoeuvring and Lockage Time
    Carral, Luis
    Tarrio-Saavedra, Javier
    Naya, Salvador
    Bogle, Johnny
    Sabonge, Rodolfo
    JOURNAL OF NAVIGATION, 2017, 70 (06): : 1205 - 1223
  • [7] Wildlife rescue and relocation efforts associated with the Panama Canal Third Locks Expansion Project
    Swan, Jennifer L.
    Carver, Andrew
    Correa, Nestor
    Nielsen, Clayton K.
    TROPICAL ZOOLOGY, 2019, 32 (02) : 58 - 79
  • [8] Numerical Prediction of the Hydrodynamic Forces on a Post-Panamax Vessel in the Third Set of Panama Locks
    Wang, Hong-Zhi
    Zou, Zao-Jian
    JOURNAL OF WATERWAY PORT COASTAL AND OCEAN ENGINEERING, 2015, 141 (01)
  • [9] Cost Overruns and Failure in Project Management: Understanding the Roles of Key Stakeholders in Construction Projects
    Doloi, Hemanta
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2013, 139 (03) : 267 - 279