A prediction model of the shortest drilling time for horizontal section in extended-reach well

被引:3
|
作者
Li, Xin [1 ,2 ,3 ]
Gao, Deli [2 ]
Lu, Baoping [1 ]
Zeng, Yijin [1 ]
Ding, Shidong [1 ]
Zhou, Shiming [1 ]
机构
[1] Sinopec Res Inst Petr Engn, Beijing 100101, Peoples R China
[2] China Univ Petr, MOE Key Lab Petr Engn, Beijing 102249, Peoples R China
[3] Univ Alberta, Edmonton, AB T6G 1H9, Canada
关键词
Shortest drilling time; Extension ability; Horizontal section; Maximum ROP; Drilling safety; Economic benefits; LIMIT;
D O I
10.1016/j.petrol.2019.106319
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Drilling the horizontal extended-reach well (ERW) with the shortest time is of great significance for drilling safety, efficiency and economic benefits. Moreover, the reservoir damage can be reduced or eliminated only when the well's horizontal section is drilled fast enough. In this paper, considering the effects of horizontal well's extension ability on the rate of penetration (ROP) and tripping in/out velocity, a prediction model of the shortest drilling time for horizontal section in ERW is established. The horizontal ERW Z-42 is analyzed, predicting its shortest drilling time in horizontal section. Results show that the predicted shortest drilling time is mainly dependent on its maximum ROP and maximum tripping in/out velocity in horizontal section. Specifically, the maximum ROP must satisfy four constraints, and the predicted maximum tripping in/out velocity must meet three constraints. Moreover, the predicted shortest time of drilling process in horizontal section is very close to the actual time in Z-42 well. In addition, the actual ROP and tripping in/out velocity in horizontal section should be as close as possible but strictly less than the predicted maximum ROP and maximum tripping in/out velocity to avoid drilling hazards. The shortest drilling time is not fixed and can be predicted in real time. Furthermore, in order to reduce the drilling time, it is necessary to reduce the times of tripping as much as possible to shorten the total drilling time of horizontal section. The model provides a practical tool to predict the shortest drilling time for horizontal section in ERW.
引用
收藏
页数:11
相关论文
共 50 条
  • [1] Prediction of casing wear in extended-reach drilling
    Gao Deli 1
    [J]. Petroleum Science, 2010, (04) : 494 - 501
  • [2] Prediction of casing wear in extended-reach drilling
    Gao Deli Sun Lianzhong and Lian Jihong Key Laboratory of Petroleum Engineering Ministry of Education China University of Petroleum Beijing China CACT Operators Group Shenzhen Guangdong China
    [J]. Petroleum Science., 2010, 7 (04) - 501
  • [3] Prediction of casing wear in extended-reach drilling
    Gao Deli
    Sun Lianzhong
    Lian Jihong
    [J]. PETROLEUM SCIENCE, 2010, 7 (04) : 494 - 501
  • [4] Study on the Mechanical Extended-Reach Limit Prediction Model of Horizontal Drilling with Dual-Channel Drillpipes
    Tan, Tianyi
    Zhang, Hui
    [J]. ENERGIES, 2021, 14 (22)
  • [5] A Prediction Model of Casing Wear in Extended-Reach Drilling With Buckled Drillstring
    Tan, Leichuan
    Gao, Deli
    Zhou, Jinhui
    [J]. JOURNAL OF APPLIED MECHANICS-TRANSACTIONS OF THE ASME, 2018, 85 (02):
  • [6] A Comprehensive Prediction Model of Hydraulic Extended-Reach Limit Considering the Allowable Range of Drilling Fluid Flow Rate in Horizontal Drilling
    Li, Xin
    Gao, Deli
    Chen, Xuyue
    [J]. SCIENTIFIC REPORTS, 2017, 7
  • [7] A Comprehensive Prediction Model of Hydraulic Extended-Reach Limit Considering the Allowable Range of Drilling Fluid Flow Rate in Horizontal Drilling
    Xin Li
    Deli Gao
    Xuyue Chen
    [J]. Scientific Reports, 7
  • [8] Study on the prediction model of the open-hole extended-reach limit in horizontal drilling considering the effects of cuttings
    Li, Xin
    Gao, Deli
    Zhou, Yingcao
    Zhang, Hui
    Yang, Yuanchao
    [J]. JOURNAL OF NATURAL GAS SCIENCE AND ENGINEERING, 2017, 40 : 159 - 167
  • [9] Horizontal and extended-reach wells
    Menand, Stéphane
    [J]. JPT, Journal of Petroleum Technology, 2020, 72 (11):
  • [10] Study on the prediction model of extended-reach limit length in horizontal drilling with dual-channel drillpipe in shale formation
    Li, Xin
    Gao, Deli
    Lu, Baoping
    Zeng, Yijin
    Zhang, Jincheng
    Zhou, Shiming
    [J]. JOURNAL OF PETROLEUM SCIENCE AND ENGINEERING, 2019, 177 : 570 - 578