Modeling the costs of bridge rehabilitation

被引:17
|
作者
ChengalurSmith, IN
Ballou, DP
Pazer, HL
机构
关键词
D O I
10.1016/S0965-8564(96)00028-6
中图分类号
F [经济];
学科分类号
02 ;
摘要
Intermediate and long range planning for Departments of Transportation necessitates the estimation of the cost of bridge rehabilitation, a range of activities falling between maintenance and replacement. This paper presents a set of regression models designed within the context of data available to the New York State Department of Transportation. The nature of the data necessitated the use of non-linear regression models which were developed using the software package TRIO. Various approaches were explored in an effort to determine which group of models performed best. For each approach models were developed for estimating separately the cost of rehabilitating the major bridge components: deck, superstructure, and substructure. One approach involved estimating costs of each component for the entire bridge. Another approach involved unit costs. In addition models were developed which allowed comparison of the predictive power of using low bid vs median bid as the dependent variable. Furthermore models were developed separately for bridges with single spans and those with multiple spans. The approach that consisted of working with the costs for the entire bridge consistently performed well. In many cases the relationship between the dependent variable (cost) and the predictor variables was highly non-linear. Due to differences in data availability and definitions the models cannot be applied directly by states other than New York. However, the procedures followed and approaches employed should provide guidance to those wishing to generate models to estimate bridge rehabilitation costs. (C) 1997 Elsevier Science Ltd.
引用
收藏
页码:281 / 293
页数:13
相关论文
共 50 条
  • [1] Lifecycle assessment of maintenance, repair and rehabilitation costs: a deterioration modeling approach for bridge components
    Institute of Construction and Engineering Management, National Central University, Taoyuan
    32001, Taiwan
    Journal of the CICHE, 1 (47-57):
  • [2] Annual rehabilitation costs estimation for a bridge network
    Yoojung Yoon
    Makarand Hastak
    KSCE Journal of Civil Engineering, 2017, 21 : 27 - 36
  • [3] Annual rehabilitation costs estimation for a bridge network
    Yoon, Yoojung
    Hastak, Makarand
    KSCE JOURNAL OF CIVIL ENGINEERING, 2017, 21 (01) : 27 - 36
  • [4] Economic analysis of bridge rehabilitation options considering life-cycle costs
    Johnson, B
    Powell, T
    Queiroz, C
    STRUCTURAL ANALYSIS AND DESIGN: BRIDGES, CULVERTS, AND PIPES, 1998, (1624): : 8 - 15
  • [5] Service life modeling : Selecting repair and rehabilitation options for bridge structures
    Sohanghpurwala, Ali Akbar
    Lasa, Ivan R.
    TR News, 2009, (264): : 27 - 28
  • [6] BRIDGE REHABILITATION PROGRAMS
    BOWERS, KS
    TRAFFIC QUARTERLY, 1980, 34 (02): : 263 - 270
  • [7] BRIDGE DECK REHABILITATION
    KISSIG, DV
    CIVIL ENGINEERING, 1985, 55 (02): : 26 - &
  • [8] Cardiac rehabilitation costs
    Moghei, Mahshid
    Turk-Adawi, Karam
    Isaranuwatchai, Wanrudee
    Sarrafzadegan, Nizal
    Oh, Paul
    Chessex, Caroline
    Grace, Sherry L.
    INTERNATIONAL JOURNAL OF CARDIOLOGY, 2017, 244 : 322 - 328
  • [9] Design cuts bridge costs
    Better Roads, 5 (27):
  • [10] Rehabilitation of the Aiken Street Bridge
    Reip, DW
    15TH ANNUAL INTERNATIONAL BRIDGE CONFERENCE AND EXHIBITION, PROCEEDINGS, 1998, : 411 - 418