Project schedule management research based on TOC

被引:0
|
作者
Cui Dong-hong [1 ]
Meng Na [1 ]
机构
[1] Shenyang Univ Technol, Management Inst, Shenyang 110023, Peoples R China
关键词
project schedule management; theory of constrain (TOC); PERT/CPM; buffer;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Aim at the traditional PERT / CPM network program's methods on the application, the Theory of Constraint (TOC) is made use of to carry on the propulsion research to the degree of progress. Through argument TOC management method to be a kind of new method of project schedule management, it makes use of the most optimistic time to estimate well, which can prevent from in progress are safe to the items in the item horary of waste and carry on the analytical, absorption to the CPM and PERT etc. technique, compensate the shortage of this theory.
引用
收藏
页码:917 / +
页数:5
相关论文
共 9 条
  • [1] BI X, 2002, PROJECT MANAGEMENT, P144
  • [2] DAI JS, 1994, COMPUTATIONAL TECHNI, V13, P60
  • [3] JET J, 1992, SUCCESSFUL PROJECT M, P269
  • [4] LI SX, 2003, CONTROL DECISION, V18, P554
  • [5] MA GF, 2001, TECHNOLOGY EC MANAGE, P57
  • [6] MA GF, 2004, J SHANGHAI JIAOTONG, P377
  • [7] [马国丰 Ma Guofeng], 2002, [管理工程学报, Journal of Industrial Engineering and Engineering Management], V16, P72
  • [8] WANG W, 2003, CHINA MANAGEMENT SCI, V11, P70
  • [9] [No title captured]