4D BIM for Environmental Planning and Management

被引:26
|
作者
Jupp, Julie [1 ]
机构
[1] Univ Technol Sydney, 15 Broadway, Ultimo 2007, Australia
关键词
4D Modelling; Virtual Models; Construction Environment Management Plans; SAFETY MANAGEMENT; CONSTRUCTION; PERFORMANCE; VISUALIZATION; MODEL; CAD;
D O I
10.1016/j.proeng.2017.04.178
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
For more than a decade research has shown that 4D Building Information Modelling (BIM) can improve construction planning, scheduling and production control as well as the onsite management of safety, workspaces and waste. The increasing use of 4D BIM in construction highlights opportunities for utilising these capabilities in new digital management systems replete with role reorganization, new practices and workflows, and not solely as a tool for constructability analysis and onsite monitoring of construction progress. Continued focus on construction-based environmental impacts provides an impetus to leverage 4D BIM to improve communication and information flow throughout environmental planning and management tasks. This paper explores how environmental planning and management can be supported by 4D capabilities. 4D modelling and analysis technologies combined with structured workflows are presented as the basis for developing a tailored framework for environmental planning and management. Five functional prerequisites necessary to the collaborative development and onsite monitoring of environmental management systems are identified before laying out the directions for future research. (C) 2017 The Authors. Published by Elsevier Ltd.
引用
收藏
页码:190 / 201
页数:12
相关论文
共 50 条
  • [1] 4D BIM for Construction Planning and Environmental Planning
    Sheina, Svetlana
    Seraya, Ekaterina
    Krikunov, Viktor
    Saltykov, Nikita
    [J]. INTERNATIONAL SCIENCE CONFERENCE SPBWOSCE-2018: BUSINESS TECHNOLOGIES FOR SUSTAINABLE URBAN DEVELOPMENT, 2019, 110
  • [2] 4D BIM for Construction Logistics Management
    Whitlock, Kane
    Abanda, Fonbeyin Henry
    Manjia, Marcelline Blanche
    Pettang, Chrispin
    Nkeng, George Elambo
    [J]. CIVILENG, 2021, 2 (02): : 325 - 348
  • [3] Physical Distancing Analytics for Construction Planning Using 4D BIM
    Hosny, Abdelhady
    Nik-Bakht, Mazdak
    Moselhi, Osama
    [J]. JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2022, 36 (04)
  • [4] Evaluation of 4D BIM tools applicability in construction planning efficiency
    Martins, Savio Santana
    Jorge Evangelista, Ana Catarina
    Hammad, Ahmed W. A.
    Tam, Vivian W. Y.
    Haddad, Assed
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (15) : 2987 - 3000
  • [5] Integrating 4D BIM and GIS for Construction Supply Chain Management
    Deng, Yichuan
    Gan, Vincent J. L.
    Das, Moumita
    Cheng, Jack C. P.
    Anumba, Chimay
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2019, 145 (04)
  • [6] 4D dynamic management for construction planning and resource utilization
    Wang, HJ
    Zhang, JP
    Chau, KW
    Anson, M
    [J]. AUTOMATION IN CONSTRUCTION, 2004, 13 (05) : 575 - 589
  • [7] Dynamic construction material layout planning optimization model by integrating 4D BIM
    Min-Yuan Cheng
    Nai-Wen Chang
    [J]. Engineering with Computers, 2019, 35 : 703 - 720
  • [8] Generative planning for construction safety surveillance camera installation in 4D BIM environment
    Si Van-Tien Tran
    Truong Linh Nguyen
    Chi, Hung-Lin
    Lee, Doyeop
    Park, Chansik
    [J]. AUTOMATION IN CONSTRUCTION, 2022, 134
  • [9] Dynamic construction material layout planning optimization model by integrating 4D BIM
    Cheng, Min-Yuan
    Chang, Nai-Wen
    [J]. ENGINEERING WITH COMPUTERS, 2019, 35 (02) : 703 - 720
  • [10] Planning efficient 4D trajectories in Air Traffic Flow Management
    Dal Sasso, Veronica
    Fomeni, Franklin Djeumou
    Lulli, Guglielmo
    Zografos, Konstantinos G.
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2019, 276 (02) : 676 - 687