A resource type analysis of the integrated project scheduling and personnel staffing problem

被引:14
|
作者
Maenhout, Broos [1 ]
Vanhoucke, Mario [1 ,2 ,3 ]
机构
[1] Univ Ghent, Fac Econ & Business Adm, B-9000 Ghent, Belgium
[2] Vlerick Business Sch, B-9000 Ghent, Belgium
[3] UCL, London WC1E 6BT, England
关键词
Manpower planning; Project scheduling; Cyclic scheduling; Non-cyclic scheduling; ALTERNATIVE LABOR POLICIES; VARIABLE DEMANDS; HIERARCHICAL WORKFORCE; CONTINUOUS OPERATIONS; COMPRESSED WORKWEEK; INTEGER PROGRAMS; FULL-TIME; DAY-OFF; CONSTRAINTS; REQUIREMENTS;
D O I
10.1007/s10479-015-2033-z
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In the integrated project scheduling and personnel staffing problem the project activities are scheduled and simultaneously a staffing plan is composed to carry out a single project. In this way, the project schedule that leads to the staffing plan with minimum cost is determined. In this paper, we evaluate different scheduling policies and practices for different personnel resource types. We examine the impact on the staffing cost when the personnel resources are scheduled in a cyclic versus a non-cyclic manner for different (days on, days off)-patterns. Furthermore, the impact of introducing more flexible resource types, such as overtime and temporary help, is explored in relationship with the activity resource demand variability. Computational results show that non-cyclic scheduling leads to a considerable lower staffing cost under all circumstances compared to cyclic scheduling. However, despite the tractability of the resource requirements, flexible temporary resources are essential on top of the regular personnel resources to respond to the variability in demand. The addition of overtime on a strategic staffing level only marginally decreases the personnel cost.
引用
收藏
页码:407 / 433
页数:27
相关论文
共 50 条
  • [1] A resource type analysis of the integrated project scheduling and personnel staffing problem
    Broos Maenhout
    Mario Vanhoucke
    [J]. Annals of Operations Research, 2017, 252 : 407 - 433
  • [2] A heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraints
    Van den Eeckhout, M.
    Maenhout, B.
    Vanhoucke, M.
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2019, 101 : 144 - 161
  • [3] Integrated staffing and scheduling for an aircraft line maintenance problem
    Belien, Jeroen
    Demeulemeester, Erik
    De Bruecker, Philippe
    Van den Bergh, Jorne
    Cardoen, Brecht
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2013, 40 (04) : 1023 - 1033
  • [4] Fitness Landscape Analysis for the Resource Constrained Project Scheduling Problem
    Czogalla, Jens
    Fink, Andreas
    [J]. LEARNING AND INTELLIGENT OPTIMIZATION, 2009, 5851 : 104 - 118
  • [5] An integrated analysis of nurse staffing and scheduling policies
    Venkataraman, R.
    Brusco, M.J.
    [J]. Omega, 1996, 24 (01): : 57 - 71
  • [6] An integrated analysis of nurse staffing and scheduling policies
    Venkataraman, R
    Brusco, MJ
    [J]. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1996, 24 (01): : 57 - 71
  • [7] An analysis of network and resource indicators for resource-constrained project scheduling problem instances
    Vanhoucke, Mario
    Coelho, Jose
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2021, 132
  • [8] Supply chain integrated resource-constrained multi-project scheduling problem
    Asadujjaman, Md.
    Rahman, Humyun Fuad
    Chakrabortty, Ripon K.
    Ryan, Michael J.
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2024, 194
  • [9] Uncertain project scheduling problem with resource constraints
    Ji, Xiaoyu
    Yao, Kai
    [J]. JOURNAL OF INTELLIGENT MANUFACTURING, 2017, 28 (03) : 575 - 580
  • [10] Uncertain project scheduling problem with resource constraints
    Xiaoyu Ji
    Kai Yao
    [J]. Journal of Intelligent Manufacturing, 2017, 28 : 575 - 580