Phase Planning for Open Pit Coal Mines through Nested Pit Generation and Dynamic Programming

被引:3
|
作者
Gu, Xiaowei [1 ]
Wang, Qing [1 ]
Xu, Xiaochuan [1 ]
Ma, Xiaoqian [1 ]
机构
[1] Northeastern Univ, Coll Resources & Civil Engn, Shenyang 110819, Peoples R China
基金
美国国家科学基金会; 中国国家自然科学基金;
关键词
The authors acknowledge the National Natural Science Foundation of China (51674062; 51974060; and; 51474049); National Science Foundation for Young Scientists of China (51604061); and Liaoning Province Key Research and Development Project (2019JH2/10300051); for their financial supports in the course of the research work presented in this paper;
D O I
10.1155/2021/8219431
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper presents a phase planning method specially designed for coal deposits with nearly horizontal, bedded coal seams. The geology of this type of deposit is modeled into a column model, instead of a block model, to avoid coal-rock mixing in blocks. A nested pit generation algorithm is developed for producing a series of nested, least-strip ratio pits with a column model as its input. The algorithm completely overcomes the troublesome gap problem. Taking the least-strip ratio pits as possible phase states, a dynamic programming formulation is proposed to simultaneously optimize the number of phases, the phase-pits, and the ultimate pit, with an objective of maximizing the net present value. The merits and capability of the proposed method are demonstrated through a case study on a large coal deposit.
引用
收藏
页数:8
相关论文
共 50 条
  • [1] PLANNING OF OPEN PIT MINES THROUGH STOCHASTIC OPTIMIZATION
    Franco Sepulveda, Giovanni
    Branch Bedoya, John Willian
    Jaramillo Alvarez, Patricia
    [J]. BOLETIN DE CIENCIAS DE LA TIERRA, 2012, (31): : 107 - 113
  • [2] Wastewater Reuse in Open Pit Coal Mines
    Ivanov, P.P.
    Pachkin, S.G.
    Ivanova, L.A.
    Mikhailova, E.S.
    Semenov, A.G.
    [J]. Journal of Mining Science, 2024, 60 (03) : 525 - 532
  • [3] The problem of production planning in open pit mines
    Sevim, H
    Lei, DD
    [J]. INFOR, 1998, 36 (1-2) : 1 - 12
  • [4] Planning of open pit mines on a risk basis
    Steffen, OKH
    [J]. JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY, 1997, 97 (02): : 47 - 56
  • [5] The assessment and management of coal recovery in open pit mines
    Scott, A
    [J]. MINE TO MILL 1998 CONFERENCE, 1998, 98 (04): : 93 - 99
  • [6] The assessment and management of coal recovery in open pit mines
    Scott, A.
    [J]. Monograph Series - Australasian Institute of Mining and Metallurgy, 2001, 23 : 379 - 388
  • [7] Simultaneous Optimization of Final Pit and Production Schedule in Open-pit Coal Mines
    Gu Xiaowei
    Wang Pengfei
    Wang Qing
    Zheng Youyi
    Liu Jianping
    Chen Bin
    [J]. INNOVATION MANUFACTURING AND ENGINEERING MANAGEMENT, 2011, 323 : 222 - +
  • [8] A practical algorithm for final-pit optimization in open-pit coal mines
    Xu, Xiao-Chuan
    Gu, Xiao-Wei
    Wang, Qing
    Zheng, You-Yi
    [J]. Dongbei Daxue Xuebao/Journal of Northeastern University, 2013, 34 (05): : 715 - 718
  • [9] Mixed integer programming model for short term planning in open-pit mines
    L'Heureux, G.
    Gamache, M.
    Soumis, F.
    [J]. TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY, 2013, 122 (02): : 101 - 109
  • [10] Next generation positioning applications for open pit mines
    不详
    [J]. CANADIAN MINING JOURNAL, 2006, 127 (04) : 51 - 52