A two-phase linear programming methodology for fuzzy multi-objective mixed-model assembly line problem

被引:13
|
作者
Mahdavi, Iraj [1 ]
Javadi, Babak [2 ]
Sahebjamnia, Navid [1 ]
Mahdavi-Amiri, Nezam [3 ]
机构
[1] Mazandaran Univ Sci & Technol, Dept Ind Engn, Babol Sar, Iran
[2] Univ Tehran, Univ Coll Engn, Dept Ind Engn, Tehran, Iran
[3] Sharif Univ Technol, Dept Math Sci, Tehran, Iran
关键词
Mixed-model assembly line; Fuzzy multi-objective linear programming; Fuzzy goal programming; Weighted additive method; SEQUENCING PROBLEM; GENETIC ALGORITHM; WORK OVERLOAD; MINIMIZE; SEARCH; SETUPS;
D O I
10.1007/s00170-008-1914-6
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
We develop a fuzzy multi-objective linear programming (FMOLP) model for solving multi-objective mixed-model assembly line problem. In practice, vagueness and imprecision of the goals in this problem make the fuzzy decision-making complicated. The proposed model considers minimizing total utility work, total production rate variation, and total setup cost, using a two-phase linear programming approach. In the first phase, the problem is solved using a max-min approach. The max-min solution not being efficient, in general, we propose a new model in the second phase to maximize a composite satisfaction degree at least as good as the degrees obtained by phase one. To show the effectiveness of the proposed approach, a numerical example is solved and the results are compared with the ones obtained by the fuzzy mixed integer goal programming and weighted additive methods. The computational results show that the proposed FMOLP model achieves lower objective functions as well as higher satisfaction degrees.
引用
收藏
页码:1010 / 1023
页数:14
相关论文
共 50 条
  • [1] A two-phase linear programming methodology for fuzzy multi-objective mixed-model assembly line problem
    Iraj Mahdavi
    Babak Javadi
    Navid Sahebjamnia
    Nezam Mahdavi-Amiri
    [J]. The International Journal of Advanced Manufacturing Technology, 2009, 44 : 1010 - 1023
  • [2] Solving a multi-objective mixed-model assembly line sequencing problem by a fuzzy goal programming approach
    Babak Javadi
    Alireza Rahimi-Vahed
    Masoud Rabbani
    Mostafa Dangchi
    [J]. The International Journal of Advanced Manufacturing Technology, 2008, 39 : 975 - 982
  • [3] Solving a multi-objective mixed-model assembly line sequencing problem by a fuzzy goal programming approach
    Javadi, Babak
    Rahimi-Vahed, Alireza
    Rabbani, Masoud
    Dangchi, Mostafa
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2008, 39 (9-10): : 975 - 982
  • [4] Solving a multi-objective mixed-model assembly line sequencing problem by a fuzzy goal programming approach
    Javadi, Babak
    Rahimi-Vahed, Alireza
    Rabbani, Masoud
    Dangchi, Mostafa
    [J]. International Journal of Advanced Manufacturing Technology, 2008, 39 (9-10): : 975 - 982
  • [5] Solving the multi-objective mixed model assembly line problem using a fuzzy multi-objective linear program
    Mahdavi, Iraj
    Javadi, Babak.
    Sabet, S. S.
    [J]. ICEIS 2007: PROCEEDINGS OF THE NINTH INTERNATIONAL CONFERENCE ON ENTERPRISE INFORMATION SYSTEMS: ARTIFICIAL INTELLIGENCE AND DECISION SUPPORT SYSTEMS, 2007, : 370 - 373
  • [6] A multi-objective scatter search for a mixed-model assembly line sequencing problem
    Rahimi-Vahed, A. R.
    Rabbani, M.
    Tavakkoli-Moghaddam, R.
    Torabi, S. A.
    Jolai, F.
    [J]. ADVANCED ENGINEERING INFORMATICS, 2007, 21 (01) : 85 - 99
  • [7] An Enhanced Two-Phase Fuzzy Programming Model for Multi-Objective Supplier Selection Problem
    Fatrias, Dicky
    Shimizu, Yoshiaki
    [J]. INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, 2012, 11 (01): : 1 - 10
  • [8] Multi-objective mixed-model assembly line rebalancing: Model and algorithm
    Yang, Cai-Jun
    Gao, Jie
    Sun, Lin-Yan
    [J]. Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2013, 33 (08): : 1956 - 1964
  • [9] Balancing problem of multi-objective mixed-model assembly line based on IWD algorithm
    Li, Mingfu
    Zhang, Yuyan
    Zhou, Houming
    [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2016, 22 (04): : 965 - 973
  • [10] Supplier selection and order allocation problem using a two-phase fuzzy multi-objective linear programming
    Nazari-Shirkouhi, Salman
    Shakouri, Hamed
    Javadi, Babak
    Keramati, Abbas
    [J]. APPLIED MATHEMATICAL MODELLING, 2013, 37 (22) : 9308 - 9323