The design of two shield blanket modules near the neutral beam (NB) port was developed at Southwestern Institute of Physics (SWIP) in collaboration with the ITER International Team. Some results are given in this paper. The HIP technology for Be/Cu joining in the first wall is being qualified at SWIP and it is also introduced.