Modeling planned downtime

被引:2
|
作者
Kimber, Douglas A.
Zhang, Xuemei
Franklin, Paul H.
Bauer, Eric J.
机构
[1] Lucent Technologies Reliability Department, Naperville, IL
[2] Lucent Technologies Reliability Department, Holmdel, NJ
[3] Architecture and Software Reliability Group, Lucent Technologies Reliability Department, Holmdel, NJ
关键词
D O I
10.1002/bltj.20174
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In general, service providers have only placed system availability requirements on equipment providers for unplanned system downtime. However, reliability expectations of service providers are shifting in a manner that places requirements on equipment providers to manage all system downtime (i.e., planned system downtime as well as unplanned system downtime) rather than focusing solely on guaranteeing unplanned system downtime. Furthermore, service providers continuously request improvements in total system availability (e.g., requiring 99.999% system availability, which translates to 5.25 minutes of total system downtime per year). While numerous models exist for modeling unplanned system downtime, there are no equivalent models for planned downtime. This paper presents a planned downtime event taxonomy, characterizes the planned downtime for each category in the taxonomy, and incorporates the results into a model for predicting the total planned downtime associated with a system. It then uses the model on an example system, demonstrating the capability of the model in assessing various system design alternatives. (C) 2006 Lucent Technologies Inc.
引用
收藏
页码:7 / 19
页数:13
相关论文
共 50 条