Barriers in contractual scope management of international development projects in Afghanistan

被引:8
|
作者
Hilali, Ahmadullah [1 ]
Charoenngam, Chotchai [2 ]
Barman, Ankita [2 ]
机构
[1] Kandahar Univ, Kandahar, Afghanistan
[2] Asian Inst Technol, Dept Construct Engn & Infrastruct Management, Bangkok, Thailand
关键词
Barriers; International construction; Afghanistan; Project management; Construction; International practice; Scope management; International development projects; CONSTRUCTION; PRICE;
D O I
10.1108/ECAM-09-2017-0197
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose For construction and management, the existing codes of practice of international organizations such as US Army Corps of Engineers, the Asian Development Bank, the World Bank, the United Nations Office for Project Services, etc., often prove ineffective when applied in post-war countries like Afghanistan. Domestic contractors faced maximum challenges in contractual scope management, which was implemented by such organizations based on their existing codes of practice. The purpose of this paper is to understand these barriers in scope management as faced by the domestic contractors of Afghanistan. Design/methodology/approach The research employs a mixed methodology to cater to its objectives. Face-to-face structured interviews of 14 industry experts and extensive literature review were conducted to identify unique barriers pertaining to Afghanistan construction industry. Further, quantitative assessment of these barriers through the statistical tools of "mean score ranking," "Kendall's test" and "independent sample t-test" was carried out to understand the severity of the barriers. Findings In total, 39 unique barriers were identified under the groups of "scope formulation," "scope completeness," "scope pricing," "scope implementation" and "scope change control." The consequential impacts of these barriers and their existence at different stages of the project were illustrated. The most severe barriers were identified as the "inadequacy of site investigation reports" and the "unavailability of resources in local markets." Originality/value The understanding of the challenges faced by local stakeholders, as highlighted by this study, can be utilized by these international organizations in their strategy and planning to ensure successful projects while also propagating the adoption of sustainable construction practices.
引用
收藏
页码:1574 / 1592
页数:19
相关论文
共 50 条
  • [1] Improving the management of international development projects
    Rodriguez-Rivero, Rocio
    Ortiz-Marcos, Isabel
    Ballesteros-Sanchez, Luis
    Sanchez, Maria Jesus
    [J]. INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2021, 14 (02) : 253 - 269
  • [2] Critical success factors for international development projects in Afghanistan: An exploratory factor analysis
    Shafiei, Nasir Ahmad
    Puttanna, K.
    [J]. JOURNAL OF PROJECT MANAGEMENT, 2022, : 217 - 228
  • [3] Contractual Guidelines for Management of Infrastructure Transportation Projects
    Elsayegh, Amr
    El-adaway, Islam H.
    Assaad, Rayan
    Ali, Gasser
    Abotaleb, Ibrahim
    Smith, Christopher
    Bootwala, Mustafa
    Eteifa, Seif
    [J]. JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2020, 12 (03)
  • [4] Reflections on per diems in international development projects: Barriers to and enablers of the project cycle
    Erasmus, Yvonne
    Lotter, Desyree
    Tannous, Natalie
    Stewart, Ruth
    [J]. DEVELOPMENT SOUTHERN AFRICA, 2018, 35 (06) : 717 - 730
  • [5] Using Methods and IT Tools Innovatively for the Management of International IS Development Projects
    Katainen, Tommi
    Nahar, Nazmun
    [J]. 2008 PORTLAND INTERNATIONAL CONFERENCE ON MANAGEMENT OF ENGINEERING & TECHNOLOGY, VOLS 1-5, 2008, : 1851 - 1863
  • [6] Adaptive project management model for the international development and aid projects
    Mahmoud Saleh, Firas Izzat
    Karia, Noorliza
    [J]. NONPROFIT MANAGEMENT & LEADERSHIP, 2022, 33 (02): : 383 - 409
  • [7] Management for International Development and Aid Projects: A new conceptual model
    Saleh, Firas Izzat Mahmoud
    Karia, Noorliza
    [J]. NONPROFIT MANAGEMENT & LEADERSHIP, 2020, 31 (02): : 373 - 386
  • [8] Fundamental uncertainties in projects and the scope of project management
    Business School, The Institute of Business and Law, Bournemouth University, Christchurch House, Fernbarrow, Poole, BH12 5BB, United Kingdom
    不详
    不详
    不详
    [J]. Int. J. Proj. Manage., 2006, 8 (687-698):
  • [9] URBAN ACTIVISM: MANAGEMENT PRACTICES OF AUTHORITIES AS RESOURCES AND BARRIERS FOR URBAN DEVELOPMENT PROJECTS
    Koroleva, M. N.
    Chernova, M. A.
    [J]. SOTSIOLOGICHESKIE ISSLEDOVANIYA, 2018, (09): : 93 - 101
  • [10] Understanding the Sub-Contractual Relationship for Proper Management of Construction Projects
    Assaad, Rayan
    Elsayegh, Amr
    Ali, Gasser
    El-Adaway, Islam
    Nabi, Mohamad Abdul
    [J]. CONSTRUCTION RESEARCH CONGRESS 2020: PROJECT MANAGEMENT AND CONTROLS, MATERIALS, AND CONTRACTS, 2020, : 1119 - 1128