Calibration of the hydraulic model of a full-scale activated sludge plant

被引:0
|
作者
Fall, Cheikh [1 ]
Loaiza-Navia, Jimmy [2 ]
机构
[1] Univ Autonoma Estado Mexico, Ctr Interamer Recursos Agua, Fac Ingn, Mexico City 50130, DF, Mexico
[2] IPD Direcc Saneamiento, Serv Agua & Drenaje Monterrey, Mexico City 64010, DF, Mexico
来源
INGENIERIA HIDRAULICA EN MEXICO | 2008年 / 23卷 / 02期
关键词
ASM1; hydrodynamics; activated sludge; simulator; reactor; rhodamine;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
When planning to simulate a wastewater treatment plant (WWTP) with the activated sludge model N degrees 1 (ASM1), one of the first requirements is to determine the hydraulic model of the reactor. The aim of this study was to evaluate the hydrodynamic regime of the aeration tank of a municipal WWTP by using a rhodamine tracer test and the Aquasim simulation software. A pre-simulation was performed in order to quantify the appropriate colorant mass, set up a sampling plan and evaluate the anticipated visual impact of the tracer test in the river receiving the treated effluents. A tracer test and dynamic flow measurements were carried out, the results of which served to establish and calibrate the hydraulic model. The evaluated tank was physically built as a plug-flow reactor subdivided in 7 compartments, but the study revealed that it is best represented by a model with 5 virtual mixed reactors in series. Through the study, the approach of using a WWTP simulator for hydraulics calibration was shown to be a powerful and flexible tool for designing a tracer test and for identifying adequate tank-in-series models of full-scale activated sludge aeration tanks.
引用
收藏
页码:123 / 133
页数:11
相关论文
共 50 条
  • [1] Calibration of a complex activated sludge model for the full-scale wastewater treatment plant
    Ewa Liwarska-Bizukojc
    Dorota Olejnik
    Rafal Biernacki
    Stanislaw Ledakowicz
    [J]. Bioprocess and Biosystems Engineering, 2011, 34 : 659 - 670
  • [2] Calibration of a complex activated sludge model for the full-scale wastewater treatment plant
    Liwarska-Bizukojc, Ewa
    Olejnik, Dorota
    Biernacki, Rafal
    Ledakowicz, Stanislaw
    [J]. BIOPROCESS AND BIOSYSTEMS ENGINEERING, 2011, 34 (06) : 659 - 670
  • [3] Reactive tracers reveal hydraulic and control instabilities in full-scale activated sludge plant
    Braun, D.
    Gujer, W.
    [J]. WATER SCIENCE AND TECHNOLOGY, 2008, 57 (07) : 1001 - 1007
  • [4] An activated sludge model based on activated sludge model number 3 for full-scale wastewater treatment plant simulation
    Fan, Ji
    Lu, Shu-Guang
    Qiu, Zhao-fu
    Wang, Xiao-Xia
    Li, Wen-Zhen
    [J]. ENVIRONMENTAL TECHNOLOGY, 2009, 30 (07) : 641 - 649
  • [5] Plant-wide Optimization of a Full-Scale Activated Sludge Plant with Anaerobic Sludge Treatment
    Puchongkawarin, C.
    Fitzgerald, S.
    Chachuat, B.
    [J]. IFAC PAPERSONLINE, 2015, 48 (08): : 1234 - 1239
  • [6] Phage-host associations in a full-scale activated sludge plant during sludge bulking
    Ruyin Liu
    Rong Qi
    Juan Wang
    Yu Zhang
    Xinchun Liu
    Simona Rossetti
    Valter Tandoi
    Min Yang
    [J]. Applied Microbiology and Biotechnology, 2017, 101 : 6495 - 6504
  • [7] Phage-host associations in a full-scale activated sludge plant during sludge bulking
    Liu, Ruyin
    Qi, Rong
    Wang, Juan
    Zhang, Yu
    Liu, Xinchun
    Rossetti, Simona
    Tandoi, Valter
    Yang, Min
    [J]. APPLIED MICROBIOLOGY AND BIOTECHNOLOGY, 2017, 101 (16) : 6495 - 6504
  • [8] Dynamics in Flocculation and Settling Properties Studied at a Full-Scale Activated Sludge Plant
    Wilen, Britt-Marie
    Lumley, Doug
    Mattsson, Ann
    Mino, Takashi
    [J]. WATER ENVIRONMENT RESEARCH, 2010, 82 (02) : 155 - 168
  • [9] Aerated denitrification in full-scale activated sludge facilities
    Goronszy, MC
    Demoulin, G
    Newland, M
    [J]. WATER SCIENCE AND TECHNOLOGY, 1997, 35 (10) : 103 - 110
  • [10] Benchmarking procedure for full-scale activated sludge plants
    Abusam, A
    Keesman, KJ
    Spanjers, H
    van Straten, G
    [J]. CONTROL ENGINEERING PRACTICE, 2004, 12 (03) : 315 - 322