Assessment of channel dynamics, in-stream structures and post-project channel adjustments in North Carolina and its implications to effective stream restoration

被引:68
|
作者
Miller, Jerry R. [1 ]
Kochel, R. Craig [2 ,3 ]
机构
[1] Western Carolina Univ, Inst Watershed Res & Management, Cullowhee, NC 28723 USA
[2] Bucknell Univ, Dept Geol, Lewisburg, PA 17837 USA
[3] Bucknell Univ, Ctr Environm, Lewisburg, PA 17837 USA
关键词
River restoration; Fluvial geomorphology; Channel adjustment; Site screening; DESIGN;
D O I
10.1007/s12665-009-0150-1
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Site assessment and monitoring data were analyzed for 26 stream restoration projects in North Carolina where the channel was reconfigured. Post-project changes in channel capacity were highly variable from site to site, but more than 60% of the projects underwent, on average at a given site, at least a 20% change in channel capacity. An analysis of site and basin geomorphology revealed that large post-construction adjustments were associated with highly dynamic stream channels characterized by a combination of high sediment transport capacity, large sediment supply, and/or easily eroded bank materials. In-stream structures along dynamic, reconfigured channels also exhibited high incidences of damage. Thus, the design and construction of channels in a state of equilibrium, which do not exhibit excessive erosion or deposition along highly dynamic rivers is currently problematic. In light of these findings, a conceptual framework based on geomorphic parameters is put forth to assess the likelihood of project success early in the design process to (1) eliminate high risk sites from consideration of channel reconfiguration and (2) improve upon the implemented management strategies that are ultimately used. It is also argued that where space permits an enhanced natural channel, adjustment approach is likely to be more effective than projects based on natural channel design.
引用
收藏
页码:1681 / 1692
页数:12
相关论文
共 6 条