Design of production process main shaft process with lean manufacturing to improve productivity

被引:0
|
作者
Siregar, I [1 ]
Nasution, A. A. [2 ]
Andayani, U. [3 ]
Anizar [1 ]
Syahputri, K. [1 ]
机构
[1] Univ Sumatera Utara, Dept Ind Engn, Medan 20155, Sumatera, Indonesia
[2] Univ Sumatera Utara, Dept Accounting, Medan 20155, Sumatera, Indonesia
[3] Univ Sumatera Utara, Dept Informat Technol, Medan 20155, Sumatera, Indonesia
关键词
D O I
10.1088/1757-899X/308/1/012005
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This object research is one of manufacturing companies that produce oil palm machinery parts. In the production process there is delay in the completion of the Main shaft order. Delays in the completion of the order indicate the low productivity of the company in terms of resource utilization. This study aimed to obtain a draft improvement of production processes that can improve productivity by identifying and eliminating activities that do not add value (non-value added activity). One approach that can be used to reduce and eliminate non-value added activity is Lean Manufacturing. This study focuses on the identification of non-value added activity with value stream mapping analysis tools, while the elimination of non-value added activity is done with tools 5 whys and implementation of pull demand system. Based on the research known that non-value added activity on the production process of the main shaft is 9,509.51 minutes of total lead time 10,804.59 minutes. This shows the level of efficiency (Process Cycle Efficiency) in the production process of the main shaft is still very low by 11.89%. Estimation results of improvement showed a decrease in total lead time became 4,355.08 minutes and greater process cycle efficiency that is equal to 29.73%, which indicates that the process was nearing the concept of lean production.
引用
收藏
页数:8
相关论文
共 50 条
  • [1] The Lean Design of Manufacturing Process
    Strachotova, Dana
    [J]. CONTEMPORARY ECONOMICS, 2008, 2 (04) : 89 - 97
  • [2] Lean manufacturing applied to a wiring production process
    Pena, R.
    Ferreira, L. P.
    Silva, F. J. G.
    Sa, J. C.
    Fernandes, N. O.
    Pereira, T.
    [J]. 30TH INTERNATIONAL CONFERENCE ON FLEXIBLE AUTOMATION AND INTELLIGENT MANUFACTURING (FAIM2021), 2020, 51 : 1387 - 1394
  • [3] Application of LEAN tools to improve component manufacturing process
    McAleer, P.
    [J]. TRANSFUSION, 2008, 48 (02) : 280A - 280A
  • [4] Analysis of production flow process with lean manufacturing approach
    Siregar, Ikhsan
    Nasution, Abdillah Arif
    Prasetio, Aji
    Fadillah, Kharis
    [J]. 1ST NOMMENSEN INTERNATIONAL CONFERENCE ON TECHNOLOGY AND ENGINEERING, 2017, 237
  • [5] Study on Manufacturing Process of Hollow Main Shaft by Open Die Forging
    Kwon, Yong Chul
    Kang, Jong Hun
    Kim, Sang Sik
    [J]. TRANSACTIONS OF THE KOREAN SOCIETY OF MECHANICAL ENGINEERS A, 2016, 40 (02) : 221 - 227
  • [6] Lean Six Sigma to improve a cement production process
    Fidan, Evrim Yavuz
    [J]. ZKG INTERNATIONAL, 2018, 71 (04): : 60 - 66
  • [7] Use of Lean Production to Improve Efficiency Of the Assembly Process
    Sasiadek, Michal
    Dvorak, Josef
    [J]. INNOVATION VISION 2020: FROM REGIONAL DEVELOPMENT SUSTAINABILITY TO GLOBAL ECONOMIC GROWTH, VOL I-VI, 2015, : 706 - 711
  • [8] Monitoring key CMP process parameters to improve manufacturing productivity
    Grayson, TS
    [J]. 1997 IEEE INTERNATIONAL SYMPOSIUM ON SEMICONDUCTOR MANUFACTURING CONFERENCE PROCEEDINGS, 1997, : P107 - P113
  • [9] Reducing waste with the lean manufacturing approach to improve process cycle efficiency
    Erwin
    Siregar, K.
    Anizar
    Sari, R. M.
    Syahputri, K.
    [J]. 2ND TALENTA CONFERENCE ON ENGINEERING, SCIENCE AND TECHNOLOGY, 2020, 801
  • [10] An extended model of design process of lean production systems by means of process variables
    Houshmand, M
    Jamshidnezhad, B
    [J]. ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2006, 22 (01) : 1 - 16