Planning and scheduling the value-added chain

被引:0
|
作者
Badell, M [1 ]
Aguer, M [1 ]
Santos, G [1 ]
Puigjaner, L [1 ]
机构
[1] Esc Univ Ing Tecn Indust EUETIB, Dept Enterp Management, Barcelona 187, Spain
关键词
D O I
暂无
中图分类号
TP31 [计算机软件];
学科分类号
081202 ; 0835 ;
摘要
The enterprise-wide optimisation of its value-added chain is performed using as target key performance indicators, KPI, that consider its business operation influence in the value added. A value-added chain can be seen as the value view of the supply chain. Having this in mind, new schedule strategies can be devised reshaping current developments for the supply chain management. The new approach is to perform an integrated and simultaneous financial/supply chain trade-off planning and scheduling optimising its economical/shareholder value. Consequently the result of this work is a decision-making tool for the optimal management of a value-added chain in manufacturing and process industries. The systematic deployment of more qualified information and the substitution of intuitive sequential decision making by simultaneous optimisation of activities could be the key of new enterprise-wide optimisation systems (Badell, 2001). Managers could make better business and technology decisions if they can use accurate simulation tools and timely process data to evaluate plans. The challenge is to obtain trade off solutions with common maximum performance measures while satisfying customers. This system gives to the financial-managers (company economist side), a tailor-made version of the scheduling tool helping them do their work. The overall simulation allows to test different alternatives during planning through a supply chain schedule with all the operation and financial information online with absolute transparency of the limitations and interactions occurring at plant and business level within each alternative. With this help it is possible to keep the visibility of the cumbersome interactions between the plant floor in multi-site levels and to change the today slave/blind position of business level during the supply chain decision-making procedures. The benefits of the value added chain management system are shown through a case study.
引用
收藏
页码:625 / 630
页数:6
相关论文
共 50 条
  • [1] Planning, scheduling and budgeting value-added chains
    Badell, M
    Romero, J
    Huertas, R
    Puigjaner, L
    [J]. COMPUTERS & CHEMICAL ENGINEERING, 2004, 28 (1-2) : 45 - 61
  • [2] Hidden Champion in the Value-Added Chain
    Kaempfer, Siegfried
    [J]. STAHL UND EISEN, 2010, 130 (02): : 68 - 71
  • [3] Value-added Products Planning of Internal Auditing
    Hui, Yan
    [J]. PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON PRODUCT INNOVATION MANAGEMENT, VOLS I AND II, 2008, : 48 - 51
  • [4] Efficiency increase along the value-added chain
    Koehler, RJ
    [J]. STAHL UND EISEN, 2005, 125 (02): : 65 - 65
  • [5] Value-Added Taxes, Chain Effects, and Informality
    de Paula, Aureo
    Scheinkman, Jose A.
    [J]. AMERICAN ECONOMIC JOURNAL-MACROECONOMICS, 2010, 2 (04) : 195 - 221
  • [6] Biopolymers - Sustainability for the Automotive Value-added Chain
    Barillari, Fabrizio
    [J]. ATZ worldwide, 2020, 122 (11) : 36 - 39
  • [7] Redistribution of Land Value-added caused by Urban Planning
    Bi, Jing
    Huang, Yaozhi
    [J]. ARCHITECTURE AND BUILDING MATERIALS, PTS 1 AND 2, 2011, 99-100 : 535 - 538
  • [8] Paper - Life Cycle Assessment and Value-Added Chain
    Kreibe, Siegfried
    [J]. WOCHENBLATT FUR PAPIERFABRIKATION, 2013, 141 (12): : 896 - 899
  • [9] The value-added in engineer programs in Colombia value-added in Colombia
    Rodriguez Jimenez, Olga Rosalba
    [J]. 2014 INTERNATIONAL CONFERENCE ON INTERACTIVE COLLABORATIVE LEARNING (ICL), 2014, : 410 - 412
  • [10] Evaluation on Core Value-Added of Value Chain Optimization in Construction Enterprises
    Ding Qi
    Ma Xiaqi
    [J]. PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2009, : 568 - +