Concurrent and collaborative process planning for automotive general assembly

被引:11
|
作者
Noh, SD
Park, YJ
Kong, SH
Han, YG
Kim, G
Lee, KI
机构
[1] Sungkyunkwan Univ, Sch Syst Management Engn, Suwon 440746, South Korea
[2] GM Daewoo Auto & Technol, Prod Res Ctr, Inchon 403714, South Korea
[3] Seoul Natl Univ, Sch Mech & Aerosp Engn, Seoul 151742, South Korea
[4] Myong Ji Univ, Div Ind Syst Engn, Yongin 449728, South Korea
[5] Seoul Natl Univ Technol, Dept Mfg Automat, Seoul 139743, South Korea
关键词
assembly process planning; bound operation method; concurrent and collaborative process planning; Web;
D O I
10.1007/s00170-004-2092-9
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
To ensure competitiveness in today's automotive market, process planning should be performed concurrently with other engineering activities during new car development. In this paper, new business workflows and the support system for process planning of an automotive general assembly are proposed and presented. Since process planning for a whole general assembly shop is a huge and complex job, several process planners should execute planning together. Therefore, planners should consult with one another regarding his/her results through continuous online communication and cooperation. Process planning based on computers, database and Internet is inevitable for reducing manufacturing preparation time and costs through concurrent and collaborative engineering. In this research, the Web-based process planning system for general assembly shops using the bound operation method is implemented and proven. By using this system, savings in time and cost of assembly process planning are possible, and the reliability of the planning results is greatly improved.
引用
收藏
页码:572 / 584
页数:13
相关论文
共 50 条
  • [1] Concurrent and collaborative process planning for automotive general assembly
    S.D. Noh
    Y.J. Park
    S.H. Kong
    Y.-G. Han
    G. Kim
    K.I. Lee
    [J]. The International Journal of Advanced Manufacturing Technology, 2005, 26 : 572 - 584
  • [2] Collaborative process planning and flow analysis for automotive assembly shops
    Noh, SD
    Kim, G
    [J]. INTERNATIONAL JOURNAL OF AUTOMOTIVE TECHNOLOGY, 2006, 7 (02) : 217 - 226
  • [3] Concurrent process flow analysis for collaborative process planning
    Ko, HS
    Kong, SH
    Noh, SD
    Han, YG
    Kim, G
    Lee, KI
    [J]. IECON'03: THE 29TH ANNUAL CONFERENCE OF THE IEEE INDUSTRIAL ELECTRONICS SOCIETY, VOLS 1 - 3, PROCEEDINGS, 2003, : 1814 - 1818
  • [4] A collaborative design platform for assembly process planning
    Xu, Yanning
    Liu, Weiwei
    [J]. COOPERATIVE DESIGN, VISUALIZATION, AND ENGINEERING, PROCEEDINGS, 2006, 4101 : 33 - 40
  • [5] A concurrent hierarchical evolution approach to assembly process planning
    Guan, Q
    Liu, JH
    Zhong, YF
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2002, 40 (14) : 3357 - 3374
  • [6] Assembly process planning and its future in collaborative manufacturing: a review
    Lihui Wang
    Shadi Keshavarzmanesh
    Hsi-Yung Feng
    Ralph O. Buchal
    [J]. The International Journal of Advanced Manufacturing Technology, 2009, 41 : 132 - 144
  • [7] An agent-based collaborative assembly process planning system
    Sang Hoon Kong
    Sang Do Noh
    Young-Geun Han
    Gibom Kim
    Kyo Il Lee
    [J]. The International Journal of Advanced Manufacturing Technology, 2006, 28 : 176 - 183
  • [8] The agent-based collaborative framework for assembly process planning
    Kong, SH
    Noh, SD
    Han, YG
    Kim, G
    Lee, KI
    [J]. INDIN 2003: IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL INFORMATICS, PROCEEDINGS, 2003, : 319 - 324
  • [9] Assembly process planning and its future in collaborative manufacturing: a review
    Wang, Lihui
    Keshavarzmanesh, Shadi
    Feng, Hsi-Yung
    Buchal, Ralph O.
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 41 (1-2): : 132 - 144
  • [10] An agent-based collaborative assembly process planning system
    Kong, SH
    Noh, SD
    Han, YG
    Kim, G
    Lee, KI
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2006, 28 (1-2): : 176 - 183