Single-machine scheduling problems with a batch-dependent aging effect and variable maintenance activities

被引:11
|
作者
Cheng, Mingbao [1 ]
Xiao, Shuxian [1 ]
Luo, Renfei [2 ]
Lian, Zhaotong [2 ]
机构
[1] Guangdong Univ Technol, Sch Management, Guangzhou, Guangdong, Peoples R China
[2] Univ Macau, Fac Business Adm, Taipa, Macau Sar, Peoples R China
基金
中国国家自然科学基金;
关键词
scheduling; single-machine; batch-dependent; ageing effect; maintenance activity; heuristic; DUE-DATE ASSIGNMENT; DETERIORATING JOBS; MAKESPAN;
D O I
10.1080/00207543.2017.1398424
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We consider single-machine scheduling problems with a batch-dependent ageing effect and variable maintenance activities between batches. The machine can process several jobs as a batch. It requires maintenance activities where the maintenance time depends on the flow time of the pre-batch, i.e. the batch processed before a batch. A job's actual processing time is an increasing exponential function of its operation time within a batch. The objectives are to minimise the makespan and the total completion time. We develop polynomial time algorithms for the makespan minimisation problem and the total completion time minimisation problem under the condition that the ageing factor is greater than one. We also provide a mathematical programming approach and two heuristic algorithms to analyse the total completion time minimisation problem when the ageing factor is less than one for even one batch. The computational analysis indicates that the proposed heuristic algorithms are more efficient for the smaller ageing factor, whereas the Modified Shortest Processing Time algorithm is more efficient than the proposed heuristic algorithms for the larger ageing factor.
引用
收藏
页码:7051 / 7063
页数:13
相关论文
共 50 条
  • [1] Minimizing the makespan on single-machine scheduling with aging effect and variable maintenance activities
    Yang, Suh-Jenq
    Yang, Dar-Li
    [J]. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2010, 38 (06): : 528 - 533
  • [2] Single-machine scheduling problems with machine aging effect and an optional maintenance activity
    Gu, Manzhan
    Lu, Xiwen
    Gu, Jinwei
    Zhang, Ying
    [J]. APPLIED MATHEMATICAL MODELLING, 2016, 40 (21-22) : 8862 - 8871
  • [3] Single-machine scheduling problems with an aging effect
    Zhao C.-L.
    Tang H.-Y.
    [J]. Journal of Applied Mathematics and Computing, 2007, 25 (1-2) : 305 - 314
  • [4] Exact algorithms for single-machine scheduling problems with a variable maintenance
    Ying, Kuo-Ching
    Lu, Chung-Cheng
    Chen, Jhao-Cheng
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2016, 98 : 427 - 433
  • [5] On exact algorithms for single-machine scheduling problems with a variable maintenance
    Wang, Qi
    Liu, Aihua
    Xiao, Junfang
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 107 : 276 - 279
  • [6] Single machine scheduling with batch-dependent setup times
    Mosheiov, G
    Oron, D
    [J]. INFORMATION PROCESSING LETTERS, 2006, 98 (02) : 73 - 78
  • [7] Single-machine scheduling with a variable maintenance activity
    Luo, Wenchang
    Cheng, T. C. E.
    Ji, Min
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2015, 79 : 168 - 174
  • [8] On single-machine scheduling with flexible maintenance activities
    Xu, Dehua
    Yin, Yunqiang
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 56 (9-12): : 1139 - 1145
  • [9] On single-machine scheduling with flexible maintenance activities
    Dehua Xu
    Yunqiang Yin
    [J]. The International Journal of Advanced Manufacturing Technology, 2011, 56 : 1139 - 1145
  • [10] Stochastic single-machine scheduling with workload-dependent maintenance activities
    Gu, Manzhan
    Yang, Weitao
    Liu, Peihai
    [J]. OPTIMIZATION LETTERS, 2024, 18 (08) : 1925 - 1947