共 27 条
- [1] SKART: A SKEWNESS- AND AUTOREGRESSION-ADJUSTED BATCH-MEANS PROCEDURE FOR SIMULATION ANALYSIS [J]. 2008 WINTER SIMULATION CONFERENCE, VOLS 1-5, 2008, : 387 - +
- [3] N-SKART: A NONSEQUENTIAL SKEWNESS- AND AUTOREGRESSION-ADJUSTED BATCH-MEANS PROCEDURE FOR SIMULATION ANALYSIS [J]. PROCEEDINGS OF THE 2009 WINTER SIMULATION CONFERENCE (WSC 2009 ), VOL 1-4, 2009, : 667 - +
- [5] SBatch: A spaced batch means procedure for simulation analysis [J]. PROCEEDINGS OF THE 2007 WINTER SIMULATION CONFERENCE, VOLS 1-5, 2007, : 442 - +
- [6] An improved batch means procedure for simulation output analysis [J]. MANAGEMENT SCIENCE, 2002, 48 (12) : 1569 - 1586
- [8] ASAP2: An improved batch means procedure for simulation output analysis [J]. PROCEEDINGS OF THE 2002 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, 2002, : 336 - 344
- [9] Experimental performance evaluation of batch means procedures for simulation output analysis [J]. PROCEEDINGS OF THE 2000 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, 2000, : 627 - 636
- [10] Simulation output analysis via dynamic batch means [J]. PROCEEDINGS OF THE 2000 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, 2000, : 637 - 645