The Asgard system: Activity-based configuration management

被引:0
|
作者
Micallef, J
Clemm, GM
机构
[1] BELLCORE, Morristown, NJ 07962 USA
[2] Atria Software Inc, Lexington, MA 02173 USA
来源
关键词
D O I
暂无
中图分类号
TP31 [计算机软件];
学科分类号
081202 ; 0835 ;
摘要
The novel aspect of the Asgard configuration management system is the integration of (1) the use of activities-named objects created by developers to represent development tasks-to define system configurations, (2) the detection of inconsistencies when activities are assembled into new configurations, and (3) dynamic controlled sharing of work products. In Asgard, a developer specifies the source versions that he wants to see by means of a baseline and a list of activities. A baseline is a fixed set of immutable source versions. An activity is a cluster of versions produced in the course of a specific development task. Activity-based configuration management provides a simple and intuitive way for developers to specify the context for their work, to track project status, and to produce accurate information for system maintainers.
引用
收藏
页码:175 / 186
页数:12
相关论文
共 50 条
  • [1] Activity-based cost management system
    Jackson, Denise F.
    Greenwood, Thomas G.
    [J]. Computers and Industrial Engineering, 1992, 23 (1-4): : 413 - 416
  • [2] AN ACTIVITY-BASED COST MANAGEMENT-SYSTEM
    JACKSON, DF
    GREENWOOD, TG
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 1992, 23 (1-4) : 413 - 416
  • [3] Developing an activity-based knowledge management system for contractors
    Tserng, HP
    Lin, YC
    [J]. AUTOMATION IN CONSTRUCTION, 2004, 13 (06) : 781 - 802
  • [4] The costs of activity-based management
    Armstrong, P
    [J]. ACCOUNTING ORGANIZATIONS AND SOCIETY, 2002, 27 (1-2) : 99 - 120
  • [5] Software for activity-based management
    Baxendale, Sidney J.
    [J]. Journal of Cost Management, 1999, 13 (02):
  • [6] ACTIVITY-BASED MANAGEMENT PRINCIPLES AND IMPLEMENTATION OPPORTUNITIES OF THE ABM SYSTEM
    Capusneanu, Sorinel
    [J]. METALURGIA INTERNATIONAL, 2009, 14 (11): : 83 - 85
  • [7] Activity-based cost management in the management of change
    Clarke, Paul
    Bellis-Jones, Robin
    [J]. TQM Magazine, 1996, 8 (02): : 43 - 48
  • [8] THE RESEARCH OF ACTIVITY-BASED MANAGEMENT METHOD
    Zheng, Yun
    Jin, Jichun
    [J]. ICIM 2008: PROCEEDINGS OF THE NINTH INTERNATIONAL CONFERENCE ON INDUSTRIAL MANAGEMENT, 2008, : 439 - 443
  • [9] The application of Activity-based Costing (ABC) and Activity-based Costing Management to the tobacco distribution
    Hu, HC
    Wang, JB
    [J]. PROCEEDINGS OF THE 12TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1 AND 2: MODERN INDUSTRIAL ENGINEERING AND INNOVATION IN ENTERPRISE MANAGEMENT, 2005, : 1321 - 1325
  • [10] Introducing Activity-Based Costing in Farm Management: The Design of the FarmBO System
    Carli, Giacomo
    Canavari, Maurizio
    Grandi, Alessandro
    [J]. INTERNATIONAL JOURNAL OF AGRICULTURAL AND ENVIRONMENTAL INFORMATION SYSTEMS, 2014, 5 (04) : 69 - 84