共 50 条
- [2] PRODUCTION AND SCHEDULING SYSTEM IN THE FLOW-SHOP [J]. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1988, 16 (06): : 608 - 611
- [3] SEARCHING FOR OPTIMALITY IN FLOW-SHOP SCHEDULING [J]. FOURTH INTERNATIONAL CONFERENCE ON COMPUTER-AIDED PRODUCTION ENGINEERING, 1988, : 211 - 214
- [4] Flow-shop scheduling in the metal industry [J]. PROCEEDINGS OF THE 1998 IEEE INTERNATIONAL CONFERENCE ON CONTROL APPLICATIONS, VOLS 1 AND 2, 1996, : 925 - 929
- [5] A note on heuristics of flow-shop scheduling [J]. OPERATIONS RESEARCH, 1996, 44 (04) : 648 - 652
- [7] Scheduling in a two-machine flow-shop for earliness/tardiness under learning effect [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 61 (9-12): : 1129 - 1137
- [8] Scheduling in a two-machine flow-shop for earliness/tardiness under learning effect [J]. The International Journal of Advanced Manufacturing Technology, 2012, 61 : 1129 - 1137
- [9] FLOW-SHOP SCHEDULING WITH RESOURCE FLEXIBILITY [J]. OPERATIONS RESEARCH, 1994, 42 (03) : 504 - 522
- [10] FLOW-SHOP SCHEDULING WITH LOT STREAMING [J]. OPERATIONS RESEARCH LETTERS, 1989, 8 (06) : 297 - 303