A Combination of Different Resource Management Policies in a Multi-Project Environment

被引:0
|
作者
Besikci, Umut [1 ]
Ulusoy, Gunduz [1 ]
Bilge, Umit [2 ]
机构
[1] Sabanci Univ, Fac Engn & Nat Sci, Istanbul, Turkey
[2] Bogazici Univ, Fac Engn, Istanbul, Turkey
关键词
Multiproject scheduling; Resource management policies; Resource sharing; Resource dedication; Resource transfer;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Multi-project problem environments are defined according to the way resources are managed in the problem environment which is called the resource management policy (RMP) in this study. Different resource management policies can be defined according to the characteristics of the projects and/or resources in the problem environment. The most common RMP encountered in the multi-project scheduling literature is the resource sharing policy (RSP) where resources can be shared among projects without any costs or limitations. This policy can be seen as an extreme case since there is a strong assumption of unconstrained resource sharing. Another RMP can be defined as the other extreme such that resources cannot be shared among projects which is called resource the dedication policy (RDP). The last RMP considered in this study is between these two policies where resources are dedicated but can be transferred among projects when a project finishes, the dedicated resources to this project can be transferred to another one starting after the finish of the corresponding project. This RPM is called the resource transfer policy (RTP). In this study we investigate a problem environment where all these three types of RPM are present. Additionally, the general resource capacities are taken as decision variables that are constrained by a given general budget. We call this multi-project environment as the Generalized Resource Portfolio Problem (GRPP). We have investigated this problem and proposed an iterative solution approach based on exact solution methods which determines the general resource capacities from the budget, resource dedications, resource sharing and resource transfer decisions and schedules the individual projects. Computational results for over forty test problems are reported.
引用
收藏
页码:864 / 869
页数:6
相关论文
共 50 条
  • [1] Resource dedication problem in a multi-project environment
    Besikci, Umut
    Bilge, Umit
    Ulusoy, Gunduz
    [J]. FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2013, 25 (1-2) : 206 - 229
  • [2] Resource dedication problem in a multi-project environment
    Umut Beşikci
    Ümit Bilge
    Gündüz Ulusoy
    [J]. Flexible Services and Manufacturing Journal, 2013, 25 : 206 - 229
  • [3] Multi-project scheduling in a construction environment with resource constraints
    Stephenson, P
    Ying, Y
    [J]. SYSTEM-BASED VISION FOR STRATEGIC AND CREATIVE DESIGN, VOLS 1-3, 2003, : 2251 - 2255
  • [4] Solving resource-constrained multi-project environment under different activity assumptions
    Ben Issa, Samer
    Patterson, Raymond A.
    Tu, Yiliu
    [J]. International Journal of Production Economics, 2021, 232
  • [5] ESTIMA, a tool for EST management in a multi-project environment
    Kumar, CG
    LeDuc, R
    Gong, G
    Roinishivili, L
    Lewin, HA
    Liu, L
    [J]. BMC BIOINFORMATICS, 2004, 5 (1)
  • [6] ESTIMA, a tool for EST management in a multi-project environment
    Charu G Kumar
    Richard LeDuc
    George Gong
    Levan Roinishivili
    Harris A Lewin
    Lei Liu
    [J]. BMC Bioinformatics, 5
  • [7] Multi-project Resource Management from Owner's Perspective
    Chen Zhonglin
    Dong Qiaoting
    Shen Yingming
    [J]. PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2009, : 272 - +
  • [8] Modeling the Transformation of Configuration Management Processes in a Multi-Project Environment
    Dotsenko, Nataliia
    Chumachenko, Igor
    Galkin, Andrii
    Kuchuk, Heorhii
    Chumachenko, Dmytro
    [J]. SUSTAINABILITY, 2023, 15 (19)
  • [9] MULTI-PROJECT SCHEDULING WITH RESOURCE CONSTRAINS
    HIRAOKA, T
    [J]. BULLETIN OF THE JSME-JAPAN SOCIETY OF MECHANICAL ENGINEERS, 1980, 23 (185): : 1929 - 1936
  • [10] Application of Scheduling and Capacity Management Tools in a Multi-project Environment
    Pinto, Leandro
    Pereira, Alberto
    Tereso, Anabela
    Brito, Marlene
    [J]. INFORMATION SYSTEMS AND TECHNOLOGIES, WORLDCIST 2022, VOL 3, 2022, 470 : 157 - 166