共 22 条
- [1] Optimum CTV fleet selection for offshore wind farm O&M activities [J]. SAFETY AND RELIABILITY: METHODOLOGY AND APPLICATIONS, 2015, : 1177 - 1185
- [2] Real-data Insights into O&M jack-up interventions in European operational offshore wind farms [J]. WindEurope Electric City 2021 - WindEurope's Annual On- and Offshore Wind Energy Event, 2021,
- [3] Vessel charter rate estimation for offshore wind O&M activities [J]. DEVELOPMENTS IN MARITIME TRANSPORTATION AND EXPLOITATION OF SEA RESOURCES, VOL 2, 2014, : 899 - 907
- [4] Offshore Wind Farm Construction Platform Jack-Up Control System [J]. 2009 WORLD NON-GRID-CONNECTED WIND POWER AND ENERGY CONFERENCE, 2009, : 399 - 402
- [5] SEA-KEEPING ANALYSIS OF AN OFFSHORE WIND FARM INSTALLATION VESSEL DURING THE JACK-UP PROCESS [J]. 33rd International Conference on Ocean, Offshore and Arctic Engineering, 2014, Vol 1A, 2014,
- [6] Optimizing Jack-up vessel strategies for maintaining offshore wind farms [J]. 14TH DEEP SEA OFFSHORE WIND R&D CONFERENCE, EERA DEEPWIND'2017, 2017, 137 : 291 - 298
- [7] On the seakeeping behaviour of an offshore wind farm vessel during the jack-up process in the early design stage [J]. SUSTAINABLE DEVELOPMENT AND INNOVATIONS IN MARINE TECHNOLOGIES, 2020, 3 : 102 - 109
- [9] CALCULATION OF THE DYNAMIC POSITIONING CAPABILITY OF AN OFFSHORE WIND FARM VESSEL DURING THE JACK-UP PROCESS IN THE EARLY DESIGN STAGE [J]. PROCEEDINGS OF THE ASME 38TH INTERNATIONAL CONFERENCE ON OCEAN, OFFSHORE AND ARCTIC ENGINEERING, 2019, VOL 1, 2019,
- [10] Evaluating resource sharing for offshore wind farm maintenance: The case of jack-up vessels [J]. RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2019, 109 : 619 - 632