Tactical crew planning in railways

被引:27
|
作者
Sahin, Guvenc [1 ]
Yuceoglu, Birol [2 ]
机构
[1] Sabanci Univ, Fac Engn & Nat Sci, TR-34956 Istanbul, Turkey
[2] Maastricht Univ, Dept Quantitat Econ, NL-6200 MD Maastricht, Netherlands
关键词
Crew planning; Railway; Capacity planning; Tactical planning; Minimum flow problem;
D O I
10.1016/j.tre.2011.05.013
中图分类号
F [经济];
学科分类号
02 ;
摘要
Tactical crew capacity planning problem in railways involves finding the minimum number of crews in a region required to operate a predetermined set of train duties satisfying the strict day-off requirement for crew. For the single-region problem, we develop two solution approaches based on a space-time network representation: the sequential approach and the integrated approach. We also study the multi-regional capacity planning problem where we minimize total system-wide capacity by simultaneously considering multiple regions within a neighborhood search algorithm based on our solution methods for the single-region problem. We present the computational study on problem instances from Turkish State Railways. (C) 2011 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1221 / 1243
页数:23
相关论文
共 50 条
  • [1] A Column-and-Row Generation Algorithm for a Crew Planning Problem in Railways
    Suyabatmaz, A. C.
    Sahin, G.
    [J]. OPERATIONS RESEARCH PROCEEDINGS 2011, 2012, : 335 - 340
  • [2] Reinventing crew scheduling at Netherlands railways
    Abbink, E
    Fischetti, M
    Kroon, L
    Timmer, G
    Vromans, M
    [J]. INTERFACES, 2005, 35 (05) : 393 - 401
  • [3] SCHEDULING AND MANAGING CREW IN THE PORTUGUESE RAILWAYS
    MORGADO, EM
    MARTINS, JP
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 1992, 5 (3-4) : 301 - 321
  • [4] Robust Tactical Crew Scheduling Under Uncertain Demand
    Rahlmann, Christian
    Wagener, Felix
    Thonemann, Ulrich W.
    [J]. TRANSPORTATION SCIENCE, 2021, 55 (06) : 1392 - 1410
  • [5] FAMILY PLANNING IN RAILWAYS
    BHATTACHARYYA, SK
    [J]. JOURNAL OF FAMILY WELFARE, 1969, 15 (03): : 31 - 36
  • [6] PLANNING IN BRITISH RAILWAYS
    LONG, RA
    [J]. LONG RANGE PLANNING, 1969, 2 (02) : 72 - 77
  • [7] Modeling the effects of crew size and crew fatigue on the control of Tactical Unmanned Aerial Vehicles (TUAVS)
    Walters, B
    French, J
    Barnes, MJ
    [J]. PROCEEDINGS OF THE 2000 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, 2000, : 920 - 924
  • [8] Integrated system planning for railways
    Dreier, J
    Brockmann, U
    [J]. COMPUTERS IN RAILWAYS V, VOL 1: RAILWAY SYSTEMS AND MANAGEMENT, 1996, : 155 - 168
  • [9] Computerized equipment planning for railways
    Harms, JP
    [J]. COMPUTERS IN RAILWAYS V, VOL 1: RAILWAY SYSTEMS AND MANAGEMENT, 1996, : 213 - 217
  • [10] Tactical network connectivity planning
    Tebben, Daniel J.
    Kim, Paul
    Dwivedi, Anurag
    [J]. 2007 IEEE MILITARY COMMUNICATIONS CONFERENCE, VOLS 1-8, 2007, : 3274 - 3280