The paper reports on data acquired during 700 days of monitoring a widened reinforced concrete under-bridge. The deck was monitored before, during and after widening and both portions of the deck, existing and new, were instrumented. Concrete strains were monitored by means of embedment and surface Vibrating Wire strain Gauges (VWG). Predicted creep, shrinkage, thermal and settlement strains were evaluated by means of a finite element analysis. The creep and shrinkage factors used were those from the simplified form of the B3 model [1]. Good agreement between calculated and measured longterm strains was observed at almost all gauge positions. From the analysis carried out, it was found that the stresses from the time dependent phenomena of creep, shrinkage and temperature, combined with those from the settlement of abutments, were greater than the magnitude of stresses obtained from the design live load.
引用
收藏
页码:714 / 719
页数:6
相关论文
共 50 条
  • [1] Time-dependent behaviour of widened reinforced concrete under-bridge
    M. Hosseini
    A. D. Jefferson
    [J]. Materials and Structures, 1998, 31 : 714 - 719
  • [2] Time-dependent reliability assessment of reinforced concrete bridge under fatigue loadings
    Li, Xingxin
    Wang, Zhengxing
    Ren, Weixin
    [J]. Zhongguo Tiedao Kexue/China Railway Science, 2009, 30 (02): : 49 - 53
  • [3] Time-dependent reliability of deteriorating reinforced concrete bridge decks
    Stewart, MG
    Rosowsky, DV
    [J]. STRUCTURAL SAFETY, 1998, 20 (01) : 91 - 109
  • [4] Time-dependent behaviour of CFRP-strengthened reinforced concrete beams
    Kaminski, M.
    Kusa, E.
    Demski, D.
    [J]. CONCRETE SOLUTIONS, 2012, : 697 - 704
  • [5] Development of time-dependent fragility functions for deteriorating reinforced concrete bridge piers
    Rao, Anirudh S.
    Lepech, Michael D.
    Kiremidjian, Anne
    [J]. STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2017, 13 (01) : 67 - 83
  • [6] Time-dependent behaviour of cracked, partially bonded reinforced concrete beams under repeated and sustained loads
    Daud, Sultan A.
    Forth, John P.
    Nikitas, Nikolaos
    [J]. ENGINEERING STRUCTURES, 2018, 163 : 267 - 280
  • [7] TIME-DEPENDENT BEHAVIOUR ANALYSIS OF LONG-SPAN CONCRETE ARCH BRIDGE
    Wang, Yongbao
    Zhao, Renda
    Jia, Yi
    Liao, Ping
    [J]. BALTIC JOURNAL OF ROAD AND BRIDGE ENGINEERING, 2019, 14 (02): : 227 - 248
  • [8] TIME-DEPENDENT BEHAVIOUR OF REINFORCED CONCRETE MULTISTOREY BUILDING FRAMES DUE TO SHRINKAGE
    Liu, C. H.
    Au, Francis T. K.
    Lee, Peter K. K.
    [J]. PROCEEDINGS OF THE 7TH INTERNATIONAL CONFERENCE ON TALL BUILDINGS, 2010, : 659 - 668
  • [9] Experimental Study of Time-dependent Behaviour of Concrete Members Reinforced with GFRP Bars
    Mias, C.
    Torres, L. I.
    Turon, A.
    Baena, M.
    Vilanova, I.
    Llorens, M.
    [J]. ADVANCES IN FRP COMPOSITES IN CIVIL ENGINEERING, 2010, : 352 - 355
  • [10] Time-Dependent Damage Evolution of Reinforced Concrete Bridge Piers: Implications for Multihazard Analysis
    Filizadeh, Reza
    Hernandez, Eric
    Rosowsky, David
    [J]. ASCE-ASME JOURNAL OF RISK AND UNCERTAINTY IN ENGINEERING SYSTEMS PART A-CIVIL ENGINEERING, 2023, 9 (01)