Flash Flood Early Warning Coupled with Hydrological Simulation and the Rising Rate of the Flood Stage in a Mountainous Small Watershed in Sichuan Province, China

被引:18
|
作者
Tu, Huawei [1 ]
Wang, Xiekang [2 ]
Zhang, Wanshun [3 ]
Peng, Hong [1 ]
Ke, Qian [4 ]
Chen, Xiaomin [3 ]
机构
[1] Wuhan Univ, Sch Water Resources & Hydropower Engn, State Key Lab Water Resources & Hydropower Engn S, Wuhan 430072, Peoples R China
[2] Sichuan Univ, State Key Lab Hydraul & Mt River Engn, Chengdu 610065, Sichuan, Peoples R China
[3] Wuhan Univ, Sch Resource & Environm Sci, Wuhan 430079, Peoples R China
[4] Delft Univ Technol, Fac Civil Engn & Geosci, Dept Hydraul Engn, NL-2628 CN Delft, Netherlands
基金
中国国家自然科学基金;
关键词
flash floods; early warning indicators; HEC-HMS model; small watershed; mountainous area; HEC-HMS; RAINFALL; MODEL; CATCHMENTS; RUNOFF; BASIN; INTERPOLATION; SYSTEM; STATE;
D O I
10.3390/w12010255
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Flash floods in mountainous areas have become more severe and frequent as a result of climate change and are a threat to public safety and social development. This study explores the application of distributed hydrological models in flash floods risk management in a small watershed in Sichuan Province, China, and aims to increase early warning lead time in mountainous areas. The Hydrologic Engineering Center's Hydrologic Modeling System (HEC-HMS) model was used to simulate the flash flood process and analyze the variation in flood hydrographs. First, the HEC-HMS model was established based on geospatial data and the river network shape, and eight heavy rainfall events from 2010 to 2015 were used for model calibration and validation, showing that the HEC-HMS model was effective for the simulation of mountain floods in the study area. Second, with the assumption that rainfall and flood events have the same frequency, the flood hydrographs with different frequencies (p = 1%, 2%, 5%, and 10%) were calculated by the HEC-HMS model. The rising limbs of the flood hydrographs were significantly different and can be divided into three parts (0-5 h, 6-10 h, and 11-15 h). The rising rate of the flood stage for each part of the flood hydrograph increases in multiples. According to the analysis of the flood hydrographs, two critical early warning indicators with an invention patent were determined in the study: the flood stage for immediate evacuation and the rising rate. The application of the indicators in the study shows that it is feasible to advance the time of issuing an early warning signal, and it is expected that the indicators can offer a reference for flash flood early warning in the study area and other small watersheds in mountainous areas.
引用
收藏
页数:17
相关论文
共 39 条
  • [1] Flash flood early warning research in China
    Li, Haichen
    Lei, Xiaohui
    Shang, Yizi
    Qin, Tao
    [J]. INTERNATIONAL JOURNAL OF WATER RESOURCES DEVELOPMENT, 2018, 34 (03) : 369 - 385
  • [2] Hydrological Simulation Study in Gansu Province of China Based on Flash Flood Analysis
    Zhang, Bingyu
    Wei, Yingtang
    Liu, Ronghua
    Tian, Shunzhen
    Wei, Kai
    [J]. WATER, 2024, 16 (03)
  • [3] Study on Division Early Warning of Flash Flood Disaster Caused by Rainstorm in Mountainous Small Watersheds
    Wang, Xiekang
    Yang, Po
    Sun, Tong
    Xu, Zexing
    [J]. Gongcheng Kexue Yu Jishu/Advanced Engineering Sciences, 2021, 53 (01): : 29 - 38
  • [4] Identification of flash flood hazard zones in mountainous small watershed of Aceh Besar Regency, Aceh Province, Indonesia
    Azmeri
    Hadihardaja, Iwan K.
    Vadiya, Rika
    [J]. EGYPTIAN JOURNAL OF REMOTE SENSING AND SPACE SCIENCES, 2016, 19 (01): : 143 - 160
  • [5] Applicability of Hydrological Models for Flash Flood Simulation in Small Catchments of Hilly Area in China
    Xin, Zhuohang
    Shi, Ke
    Wu, Chenchen
    Wang, Lu
    Ye, Lei
    [J]. OPEN GEOSCIENCES, 2019, 11 (01) : 1168 - 1181
  • [6] Rainfall Threshold for Flash Flood Early Warning Based on Rational Equation: A Case Study of Zuojiao Watershed in Yunnan Province
    Li, Q.
    Wang, Y. L.
    Li, H. C.
    Zhang, M.
    Li, C. Z.
    Chen, X.
    [J]. 1ST INTERNATIONAL GLOBAL ON RENEWABLE ENERGY AND DEVELOPMENT (IGRED 2017), 2017, 100
  • [7] Sensitivity evaluation of the flash flood warning system introduced to ungauged small mountainous basins in Korea
    YOO Chulsang
    LEE Jinwook
    CHANG Kwonhee
    YANG Dongmin
    [J]. Journal of Mountain Science, 2019, 16 (05) : 971 - 993
  • [8] Sensitivity evaluation of the flash flood warning system introduced to ungauged small mountainous basins in Korea
    Yoo, Chulsang
    Lee, Jinwook
    Chang, Kwonhee
    Yang, Dongmin
    [J]. JOURNAL OF MOUNTAIN SCIENCE, 2019, 16 (05) : 971 - 990
  • [9] Sensitivity evaluation of the flash flood warning system introduced to ungauged small mountainous basins in Korea
    Chulsang Yoo
    Jinwook Lee
    Kwonhee Chang
    Dongmin Yang
    [J]. Journal of Mountain Science, 2019, 16 : 971 - 990
  • [10] Establishing a rainfall dual-threshold for flash flood early warning considering rainfall patterns in mountainous catchment, China
    Yang, Po
    Xu, Zexing
    Yan, Xufeng
    Wang, Xiekang
    [J]. NATURAL HAZARDS, 2024, 120 (07) : 6657 - 6684