Robust hydroelectric unit commitment considering integration of large-scale photovoltaic power: A case study in China

被引:102
|
作者
Ming, Bo
Liu, Pan [1 ]
Guo, Shenglian
Cheng, Lei
Zhou, Yanlai
Gao, Shida
Li, He
机构
[1] Wuhan Univ, State Key Lab Water Resources & Hydropower Engn S, Wuhan 430072, Peoples R China
基金
中国国家自然科学基金;
关键词
Hybrid energy system; Photovoltaic power; Hydro unit commitment; Forecast uncertainty; Two-layer nested approach; ENERGY SYSTEM; HYDROPOWER PLANTS; HYBRID; OPTIMIZATION; WIND; GENERATION; OPERATION; COMPLEMENTARITY; SOLAR; RIVER;
D O I
10.1016/j.apenergy.2018.07.019
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Hybrid generation of large-scale photovoltaic (PV) power together with hydropower offers a promising option to promote the integration of PV power, because hydro units can complement variable PV generation rapidly at relatively low cost. However, the strong variations in PV generation create uncertainties for the operation of the hydro units. To improve guidelines for large-scale hydro PV plant operation, a stochastic hydro unit commitment model considering the uncertainty in forecasting PV power is presented. This model seeks robust solutions (i.e., hydro unit status) to minimize the hydro plant's water consumption when external load demands are imposed onto the hybrid system. A two-layer nested optimization framework is proposed to solve the model in a hierarchical structure. In the outer layer, a cuckoo search algorithm, combined with a novel encoding strategy, optimizes the number of online units that can meet the load demand under all PV generation processes. In the inner layer, load dispatch schemes for the given number of online units are determined by dynamic programming. China's Longyangxia hydro PV plant was selected as a case study. Operational results were compared for three scenarios: actual operation, deterministic operation without consideration of PV forecast errors, and stochastic operation with consideration of PV forecast errors. The results indicate that: (1) the encoding strategy can handle the minimum online and offline time constraints, and can decrease optimization dimensionality; (2) the two-layer nested optimizer can make robust and effective decisions within an acceptable period when using the pre-stored optimization results provided by dynamic programming; and (3) water consumption in deterministic and stochastic operation scenarios decreased by 1.5% and 1.0%, respectively, compared to that of actual operation. These findings verify the applicability and effectiveness of the proposed methods, and also highlight the importance of decreasing uncertainty in the PV power forecast.
引用
收藏
页码:1341 / 1352
页数:12
相关论文
共 50 条
  • [1] Two-level unit commitment and reserve level adjustment considering large-scale wind power integration
    Wei, Wei
    Liu, Feng
    Mei, Shengwei
    Lu, En
    [J]. INTERNATIONAL TRANSACTIONS ON ELECTRICAL ENERGY SYSTEMS, 2014, 24 (12): : 1726 - 1746
  • [2] Robust Unit Commitment with Large-Scale Battery Storage
    Jurkovic, Kristina
    Pandzic, Hrvoje
    Kuzle, Igor
    [J]. 2017 IEEE POWER & ENERGY SOCIETY GENERAL MEETING, 2017,
  • [3] Joint unit commitment model for hydro and hydrogen power to adapt to large-scale photovoltaic power
    Gong, Yu
    Liu, Tingxi
    Liu, Pan
    Tong, Xin
    [J]. ENERGY CONVERSION AND MANAGEMENT, 2024, 317
  • [4] Study on Integration of Large-Scale Photovoltaic and Wind Power Generation into a Grid
    Nzimande, Nomvelo
    Noro, Yasuhiro
    [J]. 2022 IEEE PES/IAS POWERAFRICA CONFERENCE, 2022, : 525 - 529
  • [5] Stochastic Unit Commitment With Topology Control Recourse for Power Systems With Large-Scale Renewable Integration
    Shi, Jiaying
    Oren, Shmuel S.
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2018, 33 (03) : 3315 - 3324
  • [6] Unit commitment of power system with large-scale wind power considering multi time scale flexibility contribution of demand response
    Xu, Jiayin
    Ma, Yinghao
    Li, Kun
    Li, Zhiwei
    [J]. ENERGY REPORTS, 2021, 7 : 342 - 352
  • [7] Study on Unit Commitment Problem Considering Large-Scale Superconducting Magnetic Energy Storage Systems
    Chen, Zhen
    Xiao, Xian Yong
    Li, Chang Song
    Zhang, Yin
    Zheng, Zi Xuan
    [J]. IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, 2016, 26 (07)
  • [8] Large-scale decentralized unit commitment
    Feizollahi, Mohammad Javad
    Costley, Mitch
    Ahmed, Shabbir
    Grijalva, Santiago
    [J]. INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2015, 73 : 97 - 106
  • [9] Unit commitment using improved adjustable robust optimisation for large-scale new energy power stations
    Xiu, Lian-cheng
    Kang, Zhi-liang
    Huang, Peng
    [J]. JOURNAL OF ENGINEERING-JOE, 2019, (16): : 1175 - 1180
  • [10] Research on Unit Commitment with Large-scale Wind Power Connected Power System
    Jiao, Ran
    Zhang, Baoqun
    Chi, Zhongjun
    Gong, Cheng
    Ma, Longfei
    Yang, Bing
    [J]. SEVENTH INTERNATIONAL CONFERENCE ON ELECTRONICS AND INFORMATION ENGINEERING, 2017, 10322