On the EU approach for DEMO architecture exploration and dealing with uncertainties

被引:14
|
作者
Coleman, M. [1 ,2 ]
Maviglia, F. [1 ]
Bachmann, C. [1 ]
Anthony, J. [2 ]
Federici, G. [1 ]
Shannon, M. [1 ,2 ]
Wenninger, R. [1 ,3 ]
机构
[1] EUROfus Consortium, Boltzmannstr 2, D-85748 Garching, Germany
[2] CCFE Fus Assoc, Culham Sci Ctr, Abingdon OX14 3DB, Oxon, England
[3] Max Planck Inst Plasma Phys, D-85748 Garching, Germany
基金
欧盟地平线“2020”;
关键词
DEMO; Systems engineering; Architecture; Uncertainty; Design exploration; First wall; PHYSICS BASIS; DESIGN;
D O I
10.1016/j.fusengdes.2015.12.063
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
One of the difficulties inherent in designing a future fusion reactor is dealing with uncertainty. As the major step between ITER and the commercial exploitation of nuclear fusion energy, DEMO will have to address many challenges the natures of which are still not fully known. Unlike fission reactors, fusion reactors suffer from the intrinsic complexity of the tokamak (numerous interdependent system parameters) and from the dependence of plasma physics on scale prohibiting design exploration founded on incremental progression and small-scale experimentation. For DEMO, this means that significant technical uncertainties will exist for some time to come, and a systems engineering design exploration approach must be developed to explore the reactor architecture when faced with these uncertainties. Important uncertainties in the context of fusion reactor design are discussed and a strategy for dealing with these is presented, treating the uncertainty in the first wall loads as an example. (C) 2016 Elsevier B.V. All rights reserved.
引用
收藏
页码:1158 / 1162
页数:5
相关论文
共 50 条
  • [1] EU-DEMO design space exploration and design drivers
    Kembleton, R.
    Morris, J.
    Siccinio, M.
    Maviglia, F.
    FUSION ENGINEERING AND DESIGN, 2022, 178
  • [2] Dealing With Uncertainties
    Abunjaileh, Alaa
    IEEE MICROWAVE MAGAZINE, 2020, 21 (07) : 6 - 6
  • [3] Definition of an EU-DEMO design point robust to epistemic plasma physics uncertainties
    Coleman, M.
    Zohm, H.
    Bourdelle, C.
    Maviglia, F.
    Pearce, A. J.
    Siccinio, M.
    Spagnuolo, A.
    Wiesen, S.
    NUCLEAR FUSION, 2025, 65 (03)
  • [4] DEALING WITH UNCERTAINTIES IN NUCLEAR SAFETY ANALYSES - PART I (PROBABILISTIC APPROACH)
    Apostol, Minodora
    Leca, Aureliu
    UNIVERSITY POLITEHNICA OF BUCHAREST SCIENTIFIC BULLETIN SERIES C-ELECTRICAL ENGINEERING AND COMPUTER SCIENCE, 2011, 73 (03): : 291 - 306
  • [5] Implications of uncertainties on European DEMO design
    Lux, H.
    Siccinio, M.
    Biel, W.
    Federici, G.
    Kembleton, R.
    Morris, A. W.
    Patelli, E.
    Zohm, H.
    NUCLEAR FUSION, 2019, 59 (06)
  • [6] DEALING WITH UNCERTAINTIES IN NUCLEAR SAFETY ANALYSES - PART II (DETERMINISTIC APPROACH)
    Apostol, Minodora
    Leca, Aureliu
    Constantin, Marin
    Prisecaru, Ilie
    UNIVERSITY POLITEHNICA OF BUCHAREST SCIENTIFIC BULLETIN SERIES C-ELECTRICAL ENGINEERING AND COMPUTER SCIENCE, 2011, 73 (04): : 319 - 338
  • [7] Dealing with uncertainties in nuclear safety analyses - Part I (probabilistic approach)
    Apostol, Minodora
    Leca, Aureliu
    UPB Scientific Bulletin, Series C: Electrical Engineering, 2011, 73 (03): : 291 - 306
  • [8] Dealing with Uncertainties in the Nanotech Workplace Practice: Making the Precautionary Approach Operational
    van Broekhuizen, Pieter
    JOURNAL OF BIOMEDICAL NANOTECHNOLOGY, 2011, 7 (01) : 15 - 17
  • [9] DEMO design activities in the broader approach under Japan/EU collaboration
    Okano, Kunihiko
    Federici, Gianfranco
    Tobita, Kenji
    FUSION ENGINEERING AND DESIGN, 2014, 89 (9-10) : 2008 - 2012
  • [10] DEALING WITH LEGAL LOOPHOLES AND UNCERTAINTIES WITHIN EU PUBLIC PROCUREMENT LAW REGARDING FRAMEWORK AGREEMENTS
    Andrecka, Marta
    JOURNAL OF PUBLIC PROCUREMENT, 2016, 16 (04) : 505 - 527