Modeling start-up modes and corresponding cycling costs in the unit commitment problem

被引:0
|
作者
Hermans, Mathias [1 ]
Delarue, Erik
机构
[1] Katholieke Univ Leuven, Res Grp TME, Dept Mech Engn, Heverlee, Belgium
关键词
Cycling; power generation maintenance; start-up modes; unit commitment;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Cycling of thermal power plants is gaining importance with the increase of variable and partly unpredictable renewable energy sources (RES) such as wind and solar power. The longterm cycling costs, primarily maintenance costs, are difficult to determine and account for in the scheduling stage. Furthermore, the accrued damage and resulting maintenance costs are greatly affected by the required flexibility in terms of the start-up rate. In this paper, a unit commitment formulation that allows for multiple start-up modes and accounts for the appropriate long-term maintenance costs based on long-term service agreements (LTSAs) is presented. The impact of a slow and fast start-up mode on the scheduling results in the presence of renewables forecast errors and limited scheduling horizons is investigated. Results show that fast starting can be optimal despite the higher maintenance cost and a more cost-efficient operating strategy is obtained when considering fast start maintenance penalties.
引用
收藏
页数:6
相关论文
共 50 条
  • [1] Hydropower unit start-up costs
    Bakken, BH
    Bjorkvoll, T
    [J]. 2002 IEEE POWER ENGINEERING SOCIETY SUMMER MEETING, VOLS 1-3, CONFERENCE PROCEEDINGS, 2002, : 1522 - 1527
  • [2] A Computationally Efficient Formulation to Accurately Represent Start-Up Costs in the Medium-Term Unit Commitment Problem
    Montero, Luis
    Bello, Antonio
    Reneses, Javier
    Rodriguez, Manuel
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2023, 38 (06) : 5623 - 5634
  • [3] Modeling Start-Up Times in Unit Commitment by Limiting Temperature Increase and Heating
    Huber, Matthias
    Silbernagl, Matthias
    [J]. 2015 12TH INTERNATIONAL CONFERENCE ON THE EUROPEAN ENERGY MARKET (EEM), 2015,
  • [4] Siemens optimizes start-up sequences in a power plant unit - New unit start-up simulator reduces costs
    Zaviska, O.
    Reichel, H.
    [J]. VGB PowerTech, 2001, 81 (07): : 4 - 5
  • [5] Genetic algorithm with integer representation of unit start-up and shut-down times for the unit commitment problem
    Dudek, Grzegorz
    [J]. EUROPEAN TRANSACTIONS ON ELECTRICAL POWER, 2007, 17 (05): : 500 - 511
  • [6] Start-up Search Costs
    Byrne, David P.
    de Roos, Nicolas
    [J]. AMERICAN ECONOMIC JOURNAL-MICROECONOMICS, 2022, 14 (02) : 81 - 112
  • [7] Mixed-Integer Formulation of Unit Commitment problem for power systems: Focus on start-up cost
    Tuffaha, Mutaz
    Gravdahl, Jan Tommy
    [J]. 39TH ANNUAL CONFERENCE OF THE IEEE INDUSTRIAL ELECTRONICS SOCIETY (IECON 2013), 2013, : 8160 - 8165
  • [9] Calculate start-up costs
    Tumblin, DL
    [J]. VETERINARY ECONOMICS, 1998, 39 (07): : 66 - +
  • [10] Unit Commitment With Dynamic Cycling Costs
    Troy, Niamh
    Flynn, Damian
    Milligan, Michael
    O'Malley, Mark
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2012, 27 (04) : 2196 - 2205