A comprehensive evaluation method study for dam safety

被引:9
|
作者
Jia, Fan [1 ,2 ,3 ]
Yang, Meng [1 ,2 ,3 ]
Liu, Bingrui [4 ]
Wang, Jianlei [1 ,2 ]
Gao, Jiaorong [5 ]
Su, Huaizhi [1 ,2 ,3 ]
Zhao, Erfeng [1 ,2 ,3 ]
机构
[1] Hohai Univ, State Key Lab Hydrol Water Resources & Hydraul En, Nanjing 210098, Jiangsu, Peoples R China
[2] Hohai Univ, Coll Water Conservancy & Hydropower Engn, Nanjing 210098, Jiangsu, Peoples R China
[3] Natl Engn Res Ctr Water Resources Efficient Utili, Nanjing 210098, Jiangsu, Peoples R China
[4] Hohai Univ, Coll Harbour Coastal & Offshore Engn, Nanjing 210098, Jiangsu, Peoples R China
[5] Hohai Univ, Engn Training Ctr, Nanjing 210098, Jiangsu, Peoples R China
基金
中国国家自然科学基金;
关键词
dam safety; comprehensive evaluation; cloud model; Dempster-Shafer theory; GRAVITY DAMS; CONCRETE; IDENTIFICATION; FAILURE;
D O I
10.12989/sem.2017.63.5.639
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
According to the multi-index system of dam safety assessment and the standard of safety, a comprehensive evaluation model for dam safety based on a cloud model is established to determine the basic probability assignment of the Dempster-Shafer theory. The Dempster-Shafer theory is improved to solve the high conflict problems via fusion calculation. Compared with the traditional Dempster-Shafer theory, the application is more extensive and the result is more reasonable. The uncertainty model of dam safety multi-index comprehensive evaluation is applied according to the two theories above. The rationality and feasibility of the model are verified through application to the safety evaluation of a practical arch dam.
引用
收藏
页码:639 / 646
页数:8
相关论文
共 50 条
  • [1] Fuzzy Comprehensive Evaluation of Dam Safety
    Zheng Fugang
    Liu Xing
    [J]. PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL. VIII, PTS A AND B, 2010, 8 : 1777 - 1783
  • [2] Comprehensive assessment method for large dam safety
    He Jinping
    Shi Yuqun
    Luo Guhuai
    [J]. PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL 6, PTS A AND B, 2006, 6 : 2351 - 2355
  • [3] Dam safety evaluation - A case study of Isapur dam
    Nagre, SA
    Khan, MA
    [J]. DAM SAFETY EVALUATION - 2ND INTERNATIONAL CONFERENCE, VOLS 1 AND 2, 1996, : 919 - 930
  • [4] Study on the comprehensive safety assessment of rock and soil fill dam by using fuzzy evaluation
    Hui, P
    Wang, CF
    Zhang, ZH
    [J]. Proceedings of the World Engineers' Convention 2004: Vol D, Environment Protection and Disaster Mitigation, 2004, : 439 - 442
  • [5] Quantitative and Comprehensive Evaluation of Qualitative Indices in Dam Safety Monitoring
    Xu, Bo
    Xia, Hui
    Yao, Yuan
    [J]. ADVANCED MEASUREMENT AND TEST, PTS 1-3, 2011, 301-303 : 924 - 931
  • [6] A study of safety evaluation and early-warning method for dam global behavior
    Su Huaizhi
    Hu Jiang
    Wu Zhongru
    [J]. STRUCTURAL HEALTH MONITORING-AN INTERNATIONAL JOURNAL, 2012, 11 (03): : 269 - 279
  • [7] Application of radial basis function neural network to comprehensive evaluation of dam safety
    Yan, Bin
    Gao, Zhenwei
    Li, Dongyan
    [J]. Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2008, 27 (SUPPL. 2): : 3991 - 3997
  • [8] DAM SAFETY EVALUATION CONTRACT
    不详
    [J]. PUBLIC WORKS, 1984, 115 (12): : 76 - 76
  • [9] Safety evaluation of Montargil dam
    Pinheiro, AN
    Quintela, AM
    Marques, PR
    [J]. DAMS IN A EUROPEAN CONTEXT, 2001, : 287 - 292
  • [10] Automatic Dam Safety Evaluation
    Supakchukulu, Unpong
    Laungnarutai, Wanlaya
    Jinthanakorn, Paramarporn
    Brohmsubha, Potcharapol
    Raphitphan, Nanthiya
    Suwatthikul, Jittiwut
    Vanijjirattikhan, Rangsarit
    [J]. 2019 58TH ANNUAL CONFERENCE OF THE SOCIETY OF INSTRUMENT AND CONTROL ENGINEERS OF JAPAN (SICE), 2019, : 785 - 790