Summary of beryllium qualification activity for ITER first-wall applications

被引:17
|
作者
Barabash, V. [1 ]
Eaton, R. [1 ]
Hirai, T. [1 ]
Kupriyanov, I. [2 ]
Nikolaev, G. [2 ]
Wang, Zhanhong [3 ]
Liu, Xiang [4 ]
Roedig, M. [5 ]
Linke, J. [5 ]
机构
[1] ITER Org, F-13115 St Paul Les Durance, France
[2] AA Bochvar High Technol Res Inst Inorgan Mat, Moscow 123060, Russia
[3] Ningxia Orient Grp Co Ltd, CNMC, Shizuishan City 753000, Ningxia, Peoples R China
[4] SW Inst Phys, Chengdu 610041, Sichuan, Peoples R China
[5] EURATOM, Forschungszentrum Julich, D-52425 Julich, Germany
关键词
D O I
10.1088/0031-8949/2011/T145/014007
中图分类号
O4 [物理学];
学科分类号
0702 ;
摘要
Beryllium is considered as an armor material for the ITER first wall. The ITER Final Design Report 2001 identified the reference grades S-65C vacuum hot pressed (VHP) from Brush Wellman and DShG-200 from the Russian Federation. These grades have been selected based on excellent thermal fatigue/shock behavior and the available comprehensive database. Later, Chinese and Russian ITER Parties proposed their new grades: CN-G01 (from China) and TGP-56FW (from Russia). To assess the performance of these new grades, the ITER Organization, Chinese and Russian Parties established a program for the characterization of these materials. A summary of the published data and new results are presented in the paper. It was concluded that the proposed Chinese (CN-G01) and Russian (TGP-56FW) beryllium grades can be accepted. Three grades of beryllium are now available for the armor application for the ITER first wall: S-65, CN-G01 and TGP-56FW.
引用
收藏
页数:6
相关论文
共 50 条
  • [1] Status of the beryllium tile bonding qualification activities for the manufacturing of the ITER first wall
    Mitteau, Raphael
    Eaton, R.
    Perez, G.
    Zacchia, F.
    Banetta, S.
    Bellin, B.
    Gervash, A.
    Glazunov, D.
    Chen, J.
    [J]. FUSION ENGINEERING AND DESIGN, 2015, 98-99 : 1367 - 1370
  • [2] Plasma boundary and first-wall diagnostics in ITER
    Pitcher, C. S.
    Andrew, P.
    Barnsley, R.
    Bertalot, L.
    Counsell, G. G.
    Encheva, A.
    Feder, R. E.
    Hatae, T.
    Johnson, D. W.
    Kim, J.
    Kusama, Y.
    Lee, H. G.
    Mukhin, E. E.
    Reichle, R.
    Thomas, D. M.
    Tugarinov, S. N.
    Udintsev, V. S.
    Vasu, P.
    Vayakis, G.
    Walker, C. I.
    Walsh, M. J.
    Yang, Q. W.
    Yatsuka, E.
    Zhao, J.
    Zvonkov, A. V.
    [J]. JOURNAL OF NUCLEAR MATERIALS, 2011, 415 (01) : S1127 - S1132
  • [3] Progress in development and qualification of beryllium for ITER blanket first wall application in Russian Federation
    Kupriyanov, I. B.
    Nikolaev, G. N.
    Gorayev, G.
    [J]. FUSION ENGINEERING AND DESIGN, 2017, 124 : 1004 - 1010
  • [4] FIRST-WALL PROTECTION
    MCCRACKEN, GM
    [J]. NUCLEAR FUSION, 1974, : 471 - 478
  • [5] ASSESSMENT OF BERYLLIUM TILE SIZE IN ITER EHF FIRST WALL
    Hunt, Ryan
    Zhang, Hongjie
    Ying, Alice
    Ulrickson, Michael
    [J]. FUSION SCIENCE AND TECHNOLOGY, 2011, 60 (01) : 354 - 358
  • [6] Features of plasma sprayed beryllium armor for the ITER first wall
    Nygren, R. E.
    Youchison, D. L.
    Hollis, K. J.
    [J]. JOURNAL OF NUCLEAR MATERIALS, 2007, 367 (SPEC. ISS.) : 1325 - 1329
  • [7] Plasma operation with an all metal first-wall: Comparison of an ITER-like wall with a carbon wall in JET
    Matthews, G. F.
    [J]. JOURNAL OF NUCLEAR MATERIALS, 2013, 438 : S2 - S10
  • [8] FIRST-WALL BUMPER CONCEPTS
    COULTAS, TA
    [J]. TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1974, 19 (OCT27): : 9 - 9
  • [9] Beryllium-copper diffusion bonding for an ITER first wall application
    Odegard, BC
    Cadden, CH
    [J]. 17TH IEEE/NPSS SYMPOSIUM ON FUSION ENGINEERING, VOLS 1 AND 2, 1998, : 896 - 900
  • [10] Modelling of beryllium erosion-redeposition on ITER first wall panels
    Carpentier, S.
    Pitts, R. A.
    Stangeby, P. C.
    Elder, J. D.
    Kukushkin, A. S.
    Lisgo, S.
    Fundamenski, W.
    Moulton, D.
    [J]. JOURNAL OF NUCLEAR MATERIALS, 2011, 415 (01) : S165 - S169