Rapid Evaluation of a Steel Girder Bridge: Case Study

被引:8
|
作者
James, Eric D. [1 ]
Yarnold, Matthew T. [2 ]
机构
[1] Tennessee Dept Transportat, Cookeville Operat, Unit 2721, 497 Ferrell Dr, Cookeville, TN 38506 USA
[2] Texas A&M Univ, 199 Spence St, College Stn, TX 77843 USA
关键词
Bridge testing; Rapid evaluation; Load testing; Load rating; Field assessment; HEALTH MONITORING-SYSTEM; STRUCTURAL IDENTIFICATION; HIGHWAY BRIDGES;
D O I
10.1061/(ASCE)BE.1943-5592.0001151
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A rapid evaluation methodology for steel girder bridges was researched and executed for this study. The goal was to conduct a field evaluation and load rating within a single day. To achieve this goal, three initial tasks were performed: laboratory testing to determine rapid sensor attachment, the establishment of field instrumentation guidelines, and code development to automate the data processing of crawl-speed load-test field measurements. The instrumentation guidelines and data-processing code allow for the identification of several parameters that are critical to properly representing the functional behavior of the structure. These critical parameters include composite behavior, live-load distribution factors, and presence of span continuity. With these parameters and readily available user input values, AASHTO HL-93 live-load ratings can be determined. The overall methodology was validated through a case study of a load-restricted three-span steel girder bridge. The structure was field evaluated over 1 day to produce load ratings on site. The controlling load rating of the structure prior to testing was 0.45 (operating level), which was increased to 1.56 as a result of a reduction in live-load distribution factors and the presence of composite behavior. The findings of the research illustrate the feasibility and value for rapid assessment of bridges that can potentially be incorporated into regular bridge inspection schedules. (C) 2017 American Society of Civil Engineers.
引用
收藏
页数:9
相关论文
共 50 条
  • [1] Case Study Evaluation of Steel Girder of Bridge Replacement by GFRP
    Arashnia, Parinaz
    Jahromi, Saeed Ghaffarpour
    Hatami, Farzad
    [J]. INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2015, 6 (02): : 67 - 76
  • [2] Numerical study of steel box girder bridge diaphragms
    Maleki, Shervin
    Mohammadinia, Pantea
    Dolati, Abouzar
    [J]. EARTHQUAKES AND STRUCTURES, 2016, 11 (04) : 681 - 699
  • [3] A study on ductility of high strength steel bridge girder
    Joo, H. S.
    Cha, S. H.
    Lee, H. E.
    Choi, B. H.
    [J]. BRIDGE MAINTENANCE, SAFETY, MANAGEMENT AND LIFE-CYCLE OPTIMIZATION, 2010, : 2839 - 2843
  • [4] STEEL GIRDER BRIDGE REBUTTALS
    HANNAH, TB
    [J]. CIVIL ENGINEERING, 1984, 54 (08): : 22 - 22
  • [5] Evaluation of a Steel Girder Bridge Collapse during Deck Removal
    Jauregui, David V.
    [J]. JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2014, 28 (04)
  • [6] Systematic evaluation of steel I-girder bridge constructability
    Inceefe, A.
    Attanayake, U.
    Aktan, H.
    [J]. BRIDGE MAINTENANCE, SAFETY, MANAGEMENT, LIFE-CYCLE SUSTAINABILITY AND INNOVATIONS, 2021, : 2249 - 2257
  • [7] Fatigue crack detection and evaluation in a welded steel girder highway bridge
    Fu, C. C.
    Zhao, G.
    Saad, T.
    Zhang, Y.
    Zhou, Y. E.
    [J]. BRIDGE MAINTENANCE, SAFETY, MANAGEMENT AND LIFE EXTENSION, 2014, : 1211 - 1216
  • [8] Corrosion evaluation of steel material on steel box girder bridge by comprehensive scoring method
    Fu, Z. Q.
    Ji, B. H.
    Zhao, D. D.
    Yang, M. Y.
    [J]. MATERIALS RESEARCH INNOVATIONS, 2014, 18 : 840 - 844
  • [9] Fatigue life evaluation of a through-girder steel railway bridge
    Caglayan, B. O.
    Ozakgul, K.
    Tezer, O.
    [J]. ENGINEERING FAILURE ANALYSIS, 2009, 16 (03) : 765 - 774
  • [10] The study of temperature effects on steel box girder for Taizhou Bridge
    Miao Changqing1
    2. Key Laboratory of Concrete and Prestressed Concrete Structures of the Ministry of Education
    3. Jiangsu Provincial Yangtze River Highway Bridge Construction Commanding Department
    [J]. Engineering Sciences, 2012, 10 (03) : 81 - 87